64
MYDENS
COSMOGAS
8.24 - Operational wiring diagram
Figure 8.20 - Operational wiring diagram
ATTENTION !!! To consult
the wiring diagram correctly,
references K are given followed by
a number (see example above) to
identify the correct follow-on of the
cables in the next page.
8 - MAINTENANCE
1001 - Boiler body sensor 1
1002 - DHW outlet sensor
1002 (SB) - Indirect water heater sensor
1004 - External temperature sensor
1005 - Boiler body sensor 2
1006 - Fumes sensor
1007 - Return sensor
1014 - Flue gas sensor (redundant)
CM - Boiler control unit and flame control
DSP - Display
DSPX - Remote control (on request)
EA - Ignition electrode
ER - Detection electrode
F (Digital) - Digital fan
F (BCU) - 5A fuse
F1 (SDC) - 1.6A power supply fuse
GP - Circulation pump
GS - Spark generator
Содержание MYDENS
Страница 67: ...67 MYDENS COSMOGAS 8 MAINTENANCE...
Страница 74: ......
Страница 75: ......
Страница 76: ...COSMOGAS s r l Via L da Vinci 16 47014 MELDOLA FC ITALY info cosmogas com www cosmogas com...