![Cooper safety CEAG EURO US.1 Скачать руководство пользователя страница 47](http://html1.mh-extra.com/html/cooper-safety/ceag-euro-us-1/ceag-euro-us-1_mounting-and-operating-instructions_2664639047.webp)
Mounting and Operating Manual
Central Battery System EURO ZB.1
47
CEAG Notlichtsysteme GmbH
Completing Mounting Work
Check all the wiring by way of appli-
cable plans and drawings for plantsite
installation.
Make sure that all connections have
been securely tightened.
Remove all unused cables, insulating
and fastening material as well as all
tools and packaging material.
Connections are made as per Figure
40 (single-line diagram) as well as field
installation diagrams and drawings.
The CEAG F3 remote switch is powered
via the 24-V voltage supply system of the
EURO ZB.1 (or EURO US.1).
Attention!
Do not use an external 24-V volta-
ge supply!
Note:
Observe national rules and
regulations governing the indica-
ting and signalling behavior when
using a remote switch or a remote
indicator for emergency lighting
systems.
Observe the instructions in
the Technical Documentation as
provided by the manufacturer of
the CEAG F3 remote indicator.
Fig. 40: Single-line diagram of a re-
mote switch as 24-V control loop for
system blocking (eg. during operatio-
nal downtimes)
Fig. 39: Remote switch/F3 module
Connection of a Remote Switch/F3 Remote Indicating
Unit - Completing Mounting Work
Fig. 41: The F3 remote indicating unit
is also available for mounting into
switches or cavity boxes as per DIN
VDE 0606.
11.12
Connection of a Remote Switch/F3 Remote Indi-
cating Unit
Emergency lighting