![Cooper safety CEAG EURO US.1 Скачать руководство пользователя страница 45](http://html1.mh-extra.com/html/cooper-safety/ceag-euro-us-1/ceag-euro-us-1_mounting-and-operating-instructions_2664639045.webp)
Mounting and Operating Manual
Central Battery System EURO ZB.1
45
CEAG Notlichtsysteme GmbH
Fig. 35: Schematic circuit diagram of
a TLS module. All eight inputs can be
wired like input T1 (11, 12).
The staircase lighting switching mode
must be programmed via the freely
programmable control unit of the chan-
geover system.
If the changeover devices are connected
to a CG Vision (CEWA GUARD program-
ming and monitoring system) program-
ming can be done via CG Vision (refer to
the CG Vision operating instructions).
Via the staircase lighting control optional-
ly integrated into the EURO ZB.1 the ge-
neral lighting and the emergency lighting
systems may be switched on by means
of external switches within an adjustable
time frame (1 to 15 minutes).
Fig. 34: TLS module with terminal as-
signment on module (top/bottom)
Connection of a TLS Module
No. of switches per TLS input:
Mom. contact switch Number
1 mA m.c. switch
50 pcs.
0.8 mA m.c. switch
62 pcs.
0.4 mA m.c. switch
125 pcs.
Figure 35 shows the schematic circuit
diagram of a TLS module.
The terminal assignment can be seen in
figure 34.
Leads having a conductor size of up
to 2.5 mm
2
may be connected to the
terminals.
11.10
Connection of TLS Modules
Abb. 34a : Terminal assignment
on TLS module (top/bottom)
Contact switch
Emergency lighting
General lighting