![Cooper safety CEAG EURO US.1 Скачать руководство пользователя страница 3](http://html1.mh-extra.com/html/cooper-safety/ceag-euro-us-1/ceag-euro-us-1_mounting-and-operating-instructions_2664639003.webp)
Mounting and Operating Manual
Central Battery System EURO ZB.1
3
CEAG Notlichtsysteme GmbH
12
Commissioning and Further Work
48
12.1 Disconnecting/Switching-on an Emergency Lighting System under
Battery Supply
49
12.2 Disconnecting/Switching-on a EURO ZB.1 or EURO US.1 control cabinet
49
12.3 Block/Release the Control of a EURO ZB.1
or EURO US.1 control cabinet
49
12.4 Checking all Connections / Insulation Testing
50
12.5 Testing / Replacing Fuses
51
12.6 Checking and Replacing Modules
52
13
Switching the System ON
53
Part 2
14
Controlling a EURO ZB.1 Central Battery System (EURO US.1)
54
14.1 Control and Indicating Elements of the Modules
54
15
Programming the ST 20 E Control Unit
57
16
The Setting of the Tripple Charge-Voltage at the Batterie Control Modul (BCM) 58
17
Monitoring of the Final Circuit
59
18
Programming the Circuit Monitoring Function
60
19
Programming the Final Circuit Switching Variants
61
20
Programming Final Circuits to Switched Maintained Light
62
21
Programming Final Circuits to Selective Em. Lighting Changeover (SDS 8)
63
22
Programming Final Circuits to Staircase Lighting (TLS)
64
23
Programming Staircase Lighting Cut-in Times
65
24
Troubleshooting Overview Chart
66
25
Starting Function Duration Test and Blocking the System
67
26
Function Test Assessment
68
27
Replacing Modules
69
28
Cancel Fault Messages after Remedial Action
70
29
VDE Requirements Governing Telecommunication Contacts and Buzzers
71
30
Luminaire Position Plans
72-73
31
Customer Service Requests
74
Table of contents