OPERATING & INSTALLATION INSTRUCTION 2-POST-LIFT
Switches on the main board for 1 motor-lifts
Switch on the electronic platine for initial installations and programmation
SGMX 2
LED Motor 2
LED Motor 1
Brücken
ge
nicht
stecker
brückt
Enter
Taste
Codie
Schalt
r-
er
Enter-button
Code switch
(turn with a small screwdriver)
Not
plugged
Code
switch
Enter
button
G
reen
White
Br
own
G
reen
White
br
own
Switch
position:
Function
0
Normal
drive
mode
1
Lower
limit
of
carriage
(not active)
3
Upper
limit
of
carriage
4
carriage
position
drive
5
(not
active)
6
Safety Stopp and acoustic signal for further lowering of carriage
7*
Potentiometer
test
mode
8*
Connection, signal and EEPROM test mode
9*
Fault
test
mode
(not
active)
*If you encounter any fault during these test modes, this fault will be stored on the EEPROM. The main board cannot be adjusted to
normal mode in this case. If normal drive mode is selected, and a fault acccurs during test mode, both red and green LED’s blink. To
overcame this situation, change defective parts or run test mode again.
New driving mode:
Switch on the main board – programming (initial installation of the potentiometer already done)
Step
Switch
Enter button:
Fonction:
A
4
push
Oparate mode
Lower the carriage til approx. 10mm over the ground and 10 mm overrun
reserve
B
5
Not active
C
1
push
push
Set lower limit after success of step A
Save mode
D
2
Not active
Save mode
E
0
push
Normal operation mode (both LED are red)
Move both carriages til a height of max. 1900 mm - evt. lower
F
3
push
push
Set upper limit after success of step E.
Save mode
G
0
push
Normal operation mode (both LED are red)
Lower lift to min. 200 mm above the ground in order to set safety stop.
H
6
push
push
Set safety Stopp after success of step G
Save mode
I
0
push
Normal operation mode (both LED are red)
Programming finished
push = both LED are green. should be the above disconnection point not reached,
push = both LEDare blinking green. Continue in individual drive with position 4.
Attention: no end stops!
Page 48
Содержание 2.25 EMC
Страница 66: ...OPERATING INSTALLATION INSTRUCTION 2 POST LIFT Electric diagram for chain lifts H264 H265 Page 66 ...
Страница 67: ...OPERATING INSTALLATION INSTRUCTION 2 POST LIFT Electric diagram H342 Page 67 ...
Страница 68: ...OPERATING INSTALLATION INSTRUCTION 2 POST LIFT Electric diagram H325 Page 68 ...
Страница 69: ...OPERATING INSTALLATION INSTRUCTION 2 POST LIFT Electric diagram with rotary reversing switch Page 69 ...
Страница 70: ...OPERATING INSTALLATION INSTRUCTION 2 POST LIFT Electric diagram with push button Page 70 ...
Страница 71: ...OPERATING INSTALLATION INSTRUCTION 2 POST LIFT Page 71 ...
Страница 72: ...OPERATING INSTALLATION INSTRUCTION 2 POST LIFT Page 72 ...
Страница 73: ...OPERATING INSTALLATION INSTRUCTION 2 POST LIFT Page 73 ...
Страница 74: ...OPERATING INSTALLATION INSTRUCTION 2 POST LIFT Page 74 ...
Страница 75: ...OPERATING INSTALLATION INSTRUCTION 2 POST LIFT Page 75 ...
Страница 76: ...OPERATING INSTALLATION INSTRUCTION 2 POST LIFT Page 76 ...
Страница 77: ...OPERATING INSTALLATION INSTRUCTION 2 POST LIFT Page 77 ...
Страница 78: ...OPERATING INSTALLATION INSTRUCTION 2 POST LIFT Page 78 ...
Страница 79: ...OPERATING INSTALLATION INSTRUCTION 2 POST LIFT Page 79 ...
Страница 80: ...OPERATING INSTALLATION INSTRUCTION 2 POST LIFT Page 80 ...