OPERATING & INSTALLATION INSTRUCTION 2-POST-LIFT
Service memorandum scope of performance vehicle lifts
1. Delivery by freight forwarder
invoicing with normal lump-sum freight charge: A forklift truck must be made available at short
notice. Weight of the lifts approx. 650 – 2700 kg, depending on lift type.
2. Delivery by truck with loading tailboard
invoicing with increase lump-sum freight charge: Unloading assistance must be provided at short
noticeWeight of the lifts aprrox. 650 – 2700 kg, depending on lift type.
3. Preparations for setting up
Prior to setting up the lifts the following work must be arranged by the operator:
♦
Preparation of the fundament (see standard fundaments).
♦
Laying of electrical connection lead to the place of setting up.
♦
Laying of compressed air connection to the place of setting up (if necessary).
♦
Transport of the lift to the place of setting up.
4. Minimum requirements on fundaments
The surface of the fundaments must be level and horizontal for all lifts. The underground must
conform to the general guidelines for building ground (DIN 1054).For lifts set up in the open air, the
underground must be frost-proof. When setting up on ceilings, an individual case check must be
made with the statical calculations engineer. Lifts can be anchored with dowels, shear connectors
or with M12 through bolts or threaded rods, minimum strength 8.8 and washers – see also BGG
945 -.
5. Performances of our customer service section
The Consul service section or Consul authorised partner takes on the setting up of the lift with the
following performances:
- Dowelling to the floor.
- Assembly of the lift. For setting-up of the lift, auxiliary personnel, as well as technical auxiliary
means must be provided at short notice.
- Electrical functional check and trial run without final mains connection that must be carried out by
a local specialist.
- Without final connection cablin with bei EL 2 Post-lifts, if no cable bridge is envisaged.
- Safety acceptance with entry in the test book.
- short instruction.
6. Average time requirement (prerequisite is the fulfillment of the above mentioned
conditions) :
Single Post Lift
-
approx. 3 hours working time
2-Post-Lifts
-
approx. 4 hours working time (with base frame approx. 3 hours)
With the 2-Post-Lifts of the EL models series, the electrical connection cables are only assembled
with simultaneous assembly of a cable boom (accessory). Otherwise these cables are laid by the
operator.
4-Post-Lifts:
- without after-lift
approx 7 hours working time
- with after-lift
approx. 9 hours working time
Short lifts
approx. 2 hours working time
Pantograph lifts
approx. 9 hours working time
Page 4
Содержание 2.25 EMC
Страница 66: ...OPERATING INSTALLATION INSTRUCTION 2 POST LIFT Electric diagram for chain lifts H264 H265 Page 66 ...
Страница 67: ...OPERATING INSTALLATION INSTRUCTION 2 POST LIFT Electric diagram H342 Page 67 ...
Страница 68: ...OPERATING INSTALLATION INSTRUCTION 2 POST LIFT Electric diagram H325 Page 68 ...
Страница 69: ...OPERATING INSTALLATION INSTRUCTION 2 POST LIFT Electric diagram with rotary reversing switch Page 69 ...
Страница 70: ...OPERATING INSTALLATION INSTRUCTION 2 POST LIFT Electric diagram with push button Page 70 ...
Страница 71: ...OPERATING INSTALLATION INSTRUCTION 2 POST LIFT Page 71 ...
Страница 72: ...OPERATING INSTALLATION INSTRUCTION 2 POST LIFT Page 72 ...
Страница 73: ...OPERATING INSTALLATION INSTRUCTION 2 POST LIFT Page 73 ...
Страница 74: ...OPERATING INSTALLATION INSTRUCTION 2 POST LIFT Page 74 ...
Страница 75: ...OPERATING INSTALLATION INSTRUCTION 2 POST LIFT Page 75 ...
Страница 76: ...OPERATING INSTALLATION INSTRUCTION 2 POST LIFT Page 76 ...
Страница 77: ...OPERATING INSTALLATION INSTRUCTION 2 POST LIFT Page 77 ...
Страница 78: ...OPERATING INSTALLATION INSTRUCTION 2 POST LIFT Page 78 ...
Страница 79: ...OPERATING INSTALLATION INSTRUCTION 2 POST LIFT Page 79 ...
Страница 80: ...OPERATING INSTALLATION INSTRUCTION 2 POST LIFT Page 80 ...