OPERATING & INSTALLATION INSTRUCTION 2-POST-LIFT
Faults and causes
If there are any faults with the lift, turn off immediately, make safe, secure against unauthorised use and
contact the Consul Service Section.
Repairs are only to be undertaken by qualified engineers!
- Noises during operation:
Cause:
Lack of lubrication, worn lifting screw, loose v-belt
Remedy:
Lubrication of spindles.If spindle is defective, replace it.
Tighten v-Belt (replace it).
- lift does not operate.
Remedy:
check supply current as well the fonction of the motor.
Check main switch, control circuits, fine-wire fuse
and thermal cut-out in motor winding and motor operation.
- Lift does not raise required load, or the motor „drone“
Check that the permitted lifting capacity of the lift has not been exceeded. Check the lubrication between the
load nuts and the spindle. Check the electric leads to the electric motor to see whether current is being
supplied in all 3 phases. Check the safety contacts and the drive belts
.
- Carriage only rises approx. 100 mm.
Remedy:
Check safety devices, load bearing nut is probably worn and the safety lock is actived
shut down the lift, secure against unauthorised use and inform Consul Service Section
- Arm-lock does not work.
Remedy:
Check locking blocks, check springs between blocks and side of carriage,
check lock bars for perfect fit or no damage
Check that the permitted lifting capacity of the lift has not been exceeded. Check the lubrication between the
load nuts and the spindle. Check the electric leads to the electric motor to see whether current is being
supplied in all 3 phases. Check the safety contacts and the drive belts
Your Consul Service Section should be contacted in the event of any other faults.
Repairs of Consul lifts are only to be undertaken by authorised dealers.
Only original parts are to be used. If non-orignial parts are used all warranties and liabilities are invalid.
Page 50
Содержание 2.25 EMC
Страница 66: ...OPERATING INSTALLATION INSTRUCTION 2 POST LIFT Electric diagram for chain lifts H264 H265 Page 66 ...
Страница 67: ...OPERATING INSTALLATION INSTRUCTION 2 POST LIFT Electric diagram H342 Page 67 ...
Страница 68: ...OPERATING INSTALLATION INSTRUCTION 2 POST LIFT Electric diagram H325 Page 68 ...
Страница 69: ...OPERATING INSTALLATION INSTRUCTION 2 POST LIFT Electric diagram with rotary reversing switch Page 69 ...
Страница 70: ...OPERATING INSTALLATION INSTRUCTION 2 POST LIFT Electric diagram with push button Page 70 ...
Страница 71: ...OPERATING INSTALLATION INSTRUCTION 2 POST LIFT Page 71 ...
Страница 72: ...OPERATING INSTALLATION INSTRUCTION 2 POST LIFT Page 72 ...
Страница 73: ...OPERATING INSTALLATION INSTRUCTION 2 POST LIFT Page 73 ...
Страница 74: ...OPERATING INSTALLATION INSTRUCTION 2 POST LIFT Page 74 ...
Страница 75: ...OPERATING INSTALLATION INSTRUCTION 2 POST LIFT Page 75 ...
Страница 76: ...OPERATING INSTALLATION INSTRUCTION 2 POST LIFT Page 76 ...
Страница 77: ...OPERATING INSTALLATION INSTRUCTION 2 POST LIFT Page 77 ...
Страница 78: ...OPERATING INSTALLATION INSTRUCTION 2 POST LIFT Page 78 ...
Страница 79: ...OPERATING INSTALLATION INSTRUCTION 2 POST LIFT Page 79 ...
Страница 80: ...OPERATING INSTALLATION INSTRUCTION 2 POST LIFT Page 80 ...