Mounting Instructions
ProfiDAT
®
Data Transmission System
Programm 0514
MAL0514-0005b-EN
www.conductix.com
translated document
page 66 of 82
6.7
Checklist and Initial Commissioning
WARNING!
This checklist serves as a guide to ensure the safe operation of the electrification system.
The checklist is intended for qualified professionals who install and commission electrification systems and
are familiar with the regulations on safety at work and accident prevention.
The report on the next few pages must be filled out during initial commissioning.
Final customer
Customer no.
Order no.
Place of commissioning
Address
Country
Site no.
System no.
Serial number
ProfiDAT
®
transceiver
Start of commissioning
Commissioning Engineer
End of commissioning
Name
Date
Signature