3 - 4
l I n s t a l l a t i o n
2
P o s i t i o n i n g t h e D r y e r o n t h e F l o o r
1
Lift the dryer from the shipping container
using a fork truck.
2
Position the dryer on the floor
near the hopper or ResinWorks sled. Make sure the loca-
tion allows for the connection of all hoses, keeping hose lengths as short as possible.
R e m o v i n g t h e C a b l e T i e f r o m t h e D e s -
i c c a n t W h e e l
( D 6 0 0 - 1 0 0 0 m o d e l s )
1
Open the dryer side panels and remove the cable tie(s) securing the desiccant wheel,
if it was not done while unpacking the dryer. Depending upon which size dryer you have,
there may be several cable ties.
I n s t a l l i n g t h e R e g e n e r a t i o n E x h a u s t
C o v e r
The Carousel Plus D Series Dryer’s regeneration exhaust cover must be installed.
To install the regeneration exhaust cover:
1
Remove the exhaust cover that is attached to the dryer’s shipping pallet.
2
Locate the bolt pattern at the top of the dryer
, on top of the regeneration exhaust out-
let.
3
Position the regeneration exhaust cover on top of the regeneration exhaust outlet
,
aligning both bolt patterns.
4
Secure the regeneration exhaust cover with supplied hardware
, using an appropri-
ately sized wrench.
Desiccant Cable Tie
Regeneration Exhaust
Cover
Содержание Carousel Plus D Series
Страница 6: ...iv l Table of Contents...
Страница 20: ...2 8 l Description...
Страница 40: ...3 8 l Installation...
Страница 54: ...4 14 l Operation Control Function Flow Charts From the Login Logout screen Home Login Screen 3...
Страница 74: ...4 34 l Operation Control Function Flow Charts From the Alarm screen Home Alarms Alarm Message Pop up...
Страница 90: ...4 50 l Operation...
Страница 91: ...4 O p e r a t i o n General Operation Stand Alone and ResinWorks Dryer Configuration Operation l 4 51...
Страница 112: ...5 16 l Maintenance...
Страница 208: ...C 46 l Appendix...