M o u n t i n g M e t h o d 3
(Not enough overhead clearance to insert the probe
from the top of the hopper)
1
Reference the drawings at the end of this user guide
and select the drawing
that reflects your installation.
Drill the appropriate hole in the
top of the hopper.
2
Drill and tap three 10-32 UNF
holes
to match the screw pattern
in the adapter plates and gasket.
You can use the template in the
appendix.
3
Remove the two adapter plates from the
probe mounting assembly.
Set the adapter
plates aside for use in Step 7.
4
Insert the probe and mounting
assembly through the door of the
hopper.
5
Pull the probe and mounting
assembly through the hole in the
top of the hopper.
Fold the gasket
around the probe so that it will fit
through the hole.
NOTE:
If the angled probe is
used, the bend (dog leg) in the
probe must be oriented so that it
is angled in toward the center of
the hopper.
✐
Adapter
plates
Three 10-32 UNF
holes spaced
around a 2
3/
4
in.
(69.9 mm) diame-
ter circle
2 in. (50.8 mm)
diameter probe hole
45°
Tools for Installation:
❒
Drill and 10-32 tap
❒
Flathead screwdriver
❒
7/8-in. wrench
❒
2-in. hole saw
2
5
3
4
CAUTION:
Always dis-
connect and lock out the
main power supply
before beginning the
installation process.
CAUTION: Hopper sur-
faces may be hot.
Make
sure the drying hopper is
empty and has cooled to
room temperature before
installing the probe
assembly. Failure to do
so can lead to serious
injury.
IMPORTANT:
Stretch
cloth or plastic across
the inside of the hopper
to catch metal shavings
from the hole you will
drill in the top of the
hopper.
(continued)
A p p e n d i x l
C - 1 3
Содержание Carousel Plus D Series
Страница 6: ...iv l Table of Contents...
Страница 20: ...2 8 l Description...
Страница 40: ...3 8 l Installation...
Страница 54: ...4 14 l Operation Control Function Flow Charts From the Login Logout screen Home Login Screen 3...
Страница 74: ...4 34 l Operation Control Function Flow Charts From the Alarm screen Home Alarms Alarm Message Pop up...
Страница 90: ...4 50 l Operation...
Страница 91: ...4 O p e r a t i o n General Operation Stand Alone and ResinWorks Dryer Configuration Operation l 4 51...
Страница 112: ...5 16 l Maintenance...
Страница 208: ...C 46 l Appendix...