M o u n t i n g M e t h o d 1
(New Conair hopper with Factory Installed coupling)
1
Insert the probe through the coupling
in the top of the drying hopper.
2
Screw the fitting into the coupling.
Tighten with
a wrench.
3
Make sure the probe is the correct size.
The
probe should extend from just above the top of the
hopper into the hopper, with the tip approximately
in-line with the bottom edge of the diffuser cone.
4
Push the compression sleeve into the fitting.
5
Tighten the nut over the sleeve.
The compression
sleeve will crimp the tube to hold the probe in
place. Be sure to position the connector in such a
way as to avoid interference of the cable with the
loader, etc. Use a wrench to tighten the nut so that
it covers the threads.
Sleeve
Connector
Coupling
Tools for Installation:
❒
7/8-in. wrench
NOTE:
The mounting
adapter kit will only be
included if the DM was
ordered as a retrofit kit.
✐
NOTE:
If the angled probe is
used, the bend (dog leg) in
the probe must be oriented
so that it is angled in toward
the center of the hopper.
✐
2
3
4
5
CAUTION:
Always dis-
connect and lock out
the main power supply
before beginning the
installation process.
CAUTION: Hopper sur-
faces may be hot.
Make
sure the drying hopper is
empty and has cooled to
room temperature before
installing the probe
assembly. Failure to do
so can lead to serious
injury.
A p p e n d i x l
C - 1 1
Содержание Carousel Plus D Series
Страница 6: ...iv l Table of Contents...
Страница 20: ...2 8 l Description...
Страница 40: ...3 8 l Installation...
Страница 54: ...4 14 l Operation Control Function Flow Charts From the Login Logout screen Home Login Screen 3...
Страница 74: ...4 34 l Operation Control Function Flow Charts From the Alarm screen Home Alarms Alarm Message Pop up...
Страница 90: ...4 50 l Operation...
Страница 91: ...4 O p e r a t i o n General Operation Stand Alone and ResinWorks Dryer Configuration Operation l 4 51...
Страница 112: ...5 16 l Maintenance...
Страница 208: ...C 46 l Appendix...