Mount the Fiber CAP L
Wire a Hybrid Fiber Splice Box for 2-Wire Power without Limited Power Source
Each CAP L can be powered by 2 wires if LPS from the DC PSU are not required by local regulations..
All four pins of the proprietary CAP L 4-pin 36 to 60 Vdc Power connector must be terminated.
1
and
to wire a Hybrid Fiber Splice Box for 2-Wire power without an Limited
Power Source (LPS).
In this power variation you must tie the following power cables together:
•
V1+
(PIN
1)
and
V2+
(PIN
3)
(CAP L DC Jumper Power Cable Red and White wires)
•
V1-
(PIN
2)
and
V2-
(PIN
4)
(CAP L DC Jumper Power Cable Black and Green wires)
Table 11.
Wiring Single Circuit Source to a CAP L
Source Cable
CAP L Power Cable
Connector
Wire
Wire
Pin
Function
Circuit 1 (0V)
Red
1
V1+
White
3
V2+
Circuit 1 (-36 to -60V)
Black
2
V1-
Green
4
V2-
Pin 1
Pin 2
Pin 4
Pin 3
Connector End View
PIN 1
RED
PIN 2
BLACK
PIN 3
WHITE
PIN 4
GREEN
Three-posion wire connectors
(such as, Wago 221-413)
Hybrid Fiber/Composite
cable
Color code of hybrid cable may
differ from example shown.
Figure 20.
Wiring a Hybrid Fiber Splice Box for 2-Wire Power without LPS