![Cloos NexT 452 AC Скачать руководство пользователя страница 78](http://html1.mh-extra.com/html/cloos/next-452-ac/next-452-ac_operating-instructions-manual_2625802078.webp)
78
MAIN (2) - Config (Configuration)
9.6 Config - Clock
For an exact data recording during weld data monitoring the exact time
and the correct data are important. You can enter this data in the "Config
- Clock" menu. Use the arrow symbols to switch between the individual
menu items. The input is made with rotary knob 3.
The input is finished by pressing rotary knob 3. To exit the menu, press the
"Esc" key.
9.7 Config - Process monitoring
Arc existing process control
If the signal "Arc existing" is not active for more than 1 second during the
welding process (process phase), the error message "Err. 23 Arc failure pro-
cess phase" will appear on the display.
You have the following options:
• Off
• Reset on Start
The error message is reset at the next "Welding start" signal.
• Reset from external
The error message is reset by an external signal (OMI or bus system).
Ignition control
If there is no signal "Arc existing" within 5 seconds after the command
"Start welding", the error message "Err. 24 Arc failure ignition phase" will
appear on the display.
You have the following options:
• Off
When the ignition control is off, wire feed will continue in case of a trouble
signal.
• Reset on Start
The error message is reset at the next "Welding start" signal.
• Reset from external
The error message is reset by an external signal (OMI or bus system).
INFO!
Puls 4 -Takt
V
0
A
1.2 mm Fe
82% Argon 18% Co
2
0.0
Konfig – Prozessüberwachung
LB-Steht Prozesskontrolle
Reset bei Start
Funktion
Zündkontrolle
Reset bei Start
Funktion
Puls 4 -Takt
V
0
A
1.2 mm Fe
82% Argon 18% Co
2
0.0
Puls 4 -Takt
V
0
A
1.2 mm Fe
82% Argon 18% Co
2
0.0
Konfig – Prozessüberwachung
LB-Steht Prozesskontrolle
Reset bei Start
Funktion
Zündkontrolle
Reset bei Start
Funktion
Figure 49.
"Config" - "Process monitoring" menu
Содержание NexT 452 AC
Страница 4: ......
Страница 11: ...11 Block 1 Operational Safety...
Страница 27: ...27 Block 2 Basic information Qineo NexT...
Страница 110: ...110 Job mode...
Страница 148: ...148...
Страница 149: ...149 Block 4 Additional information...
Страница 164: ...164 SD module...
Страница 184: ...184 General commissioning 8 3 2 QWD P5 QWD M5 The illustrations may differ from the original INFO 4 3 2 1...
Страница 191: ...191 Block 6a Error messages...
Страница 207: ...207 Block 6b General maintenance instructions...
Страница 208: ...208 1 Maintenance and Care 1 7 4 5 2 3 8 10 Optional external cooling unit 10 9 Optional lifting eyes 3 11...
Страница 212: ...212...
Страница 213: ...213 Block 7 Automation...
Страница 232: ...232...
Страница 233: ...233...
Страница 234: ...www qineo de...