![Cloos NexT 452 AC Скачать руководство пользователя страница 123](http://html1.mh-extra.com/html/cloos/next-452-ac/next-452-ac_operating-instructions-manual_2625802123.webp)
123
4.1.3 Operating mode Super-4-cycle
Operating mode Super-4-cycle is provided for longer standard manual
welding tasks. The operating mode allows working with different main
parameters for the so-called power continuation. The power continuation
is ensured by shortly pressing the torch trigger.
1st cycle --> Press and hold torch trigger
• Solenoid valve for shielding gas opens
• Welding voltage is applied on wire electrode
• Wire drive unit starts with reduced speed (inching-in)
• Arc ignites, welding current flows
• Wire drive unit switches to the preset speed
2nd cycle --> Release torch trigger
• The start program is executed with the adjusted parameters and then
switches via a programmable time function ("Upslope") to the main
program.
If the start time in the program menu is set to "Torch", releasing the torch
trigger switches to the main program.
(Optional) Power continuation --> Tap torch trigger
• Depending on the configuration of the "Step modulation" and "Num-
ber of steps" parameters, the power and wire feed speed are increased
or reduced with each press of the button on the torch. You can find
additional information in the chapter "4.2 Configuration of character-
istic curve".
3rd cycle --> Press and hold torch trigger
• A time function (Downslope) switches from the main program to the
end program and the end parameters are executed.
4th cycle --> Release torch trigger
If the end crater filling time parameter is set to "Torch", the end parame-
ters are not executed until the torch trigger is released.
• Wire drive unit stops
• Weld voltage switches off after expiration of the "burnback time"
• Arc extinguishes
• Solenoid valve closes after expiration of the "gas post-flow time"
3 s
0
+4
+4
2 s
Torch
Keystroke
Welding
time
Start time: 1
sec
End crater filling
time: Torch
Upslope
2 sec
Downslope
3 sec
Main power
Step modu2
Number of steps: 3
1 s
+6
+2
+2
Torch
Gas pre-flow +
inching in
Bu
Gas post-flow
Step 1
Step 1
Step 2
Step 3
Step 2
ATTENTION!
ATTENTION!
Содержание NexT 452 AC
Страница 4: ......
Страница 11: ...11 Block 1 Operational Safety...
Страница 27: ...27 Block 2 Basic information Qineo NexT...
Страница 110: ...110 Job mode...
Страница 148: ...148...
Страница 149: ...149 Block 4 Additional information...
Страница 164: ...164 SD module...
Страница 184: ...184 General commissioning 8 3 2 QWD P5 QWD M5 The illustrations may differ from the original INFO 4 3 2 1...
Страница 191: ...191 Block 6a Error messages...
Страница 207: ...207 Block 6b General maintenance instructions...
Страница 208: ...208 1 Maintenance and Care 1 7 4 5 2 3 8 10 Optional external cooling unit 10 9 Optional lifting eyes 3 11...
Страница 212: ...212...
Страница 213: ...213 Block 7 Automation...
Страница 232: ...232...
Страница 233: ...233...
Страница 234: ...www qineo de...