229
a1) Synchronous [ f
1
= f
2
]
With this adjustment, the pulse phases [f
2
… f
n
] of the pulse receiver are
synchronous to the pulse generator.
"
Pulse generator (f
1
)" - "Pulse receiver (f
2
)" synchronous.
a2) Synchronous 1/2 [ ½ f
1
= f
2
]
With this adjustment, the synchronised pulse phases [f
2
… f
n
] of the
pulse receiver are performed with half of the frequency of the pulse
generator.
"
Pulse generator (f
1
)" - "Pulse receiver (f
2
)" synchronous 1/2.
b1) Alternating [f
1
= f
2
]
With this adjustment, the synchronised pulse phases [f2 … fn] of the
pulse receiver are performed time-delayed to the pulse generator. The
phase shift is adjusted at the pulse generator between 10 % and 90 %.
The picture shows a phase shift of 50 %.
Alternately synchronised pulse mode has a mostly positive influence
on the process stability.
"Pulse generator (f
1
)" - "Pulse receiver (f
2
)" alternating.
b2) Alternating 1/2 [ ½ f
1
= f
2
]
With this adjustment, the time-delayed synchronised pulse phases
[f2 … fn] of the pulse receiver are performed with half of the frequency
of the pulse generator. The phase shift is adjusted at the pulse genera-
tor between 10 % and 90 %. The picture shows a phase shift of 50 %.
The pulse phases are alternately synchronous.
"Pulse generator (f
1
)" - "Pulse receiver (f
2
)" alternating 1/2.
c) Asynchronous [f
1
≠ f
2
]
With this adjustment, the pulse phases [f
1
, f
2
… f
n
] of the pulse receiver
are asynchronous to the pulse generator.
Use this adjustment when a synchronisation, also alternating, is not
imperative during welding.
"Pulse generator (f
1
)" - "Pulse receiver (f
2
)" asynchronous
f
1
f
2
a1)
t
I
f
1
f
2
I
a2)
t
I
I
f
1
f
2
b1)
t
I
f
1
f
2
b2)
t
I
I
f
1
f
2
c)
t
I
I
I
Содержание NexT 452 AC
Страница 4: ......
Страница 11: ...11 Block 1 Operational Safety...
Страница 27: ...27 Block 2 Basic information Qineo NexT...
Страница 110: ...110 Job mode...
Страница 148: ...148...
Страница 149: ...149 Block 4 Additional information...
Страница 164: ...164 SD module...
Страница 184: ...184 General commissioning 8 3 2 QWD P5 QWD M5 The illustrations may differ from the original INFO 4 3 2 1...
Страница 191: ...191 Block 6a Error messages...
Страница 207: ...207 Block 6b General maintenance instructions...
Страница 208: ...208 1 Maintenance and Care 1 7 4 5 2 3 8 10 Optional external cooling unit 10 9 Optional lifting eyes 3 11...
Страница 212: ...212...
Страница 213: ...213 Block 7 Automation...
Страница 232: ...232...
Страница 233: ...233...
Страница 234: ...www qineo de...