Operations sequence
Before starting the unit pump :
1 close all vents in the high points of the unit’s water circuit.
2 close all drain shut-off valves in the low points of the unit’s
water circuit:
Heat exchangers
Pumps
collectors
storage tank
3 Wash the system thoroughly with clean water:
use the bypass to exclude the exchanger from the flow
(diagram on the previous page)
fill and empty the system multiple times.
4 Apply additives to prevent corrosion, fouling, formation of mud
and algae.
5 Fill the system
Do not use the unti pump.
6 Conduct a leak test.
7 Isolate the pipes to avoid heat dispersions and formation of
condensate.
8 Leave various service points free (wells, vents, etc).
Note
Neglecting to wash will lead to the filter having to be cleaned
many times and at worst may damage the exchangers and
other parts
Input and output manifolds
Cooling (Kw)
Min Max
Piping water
IN-OUT
15
30
DN40
30
90
DN50
90
130
DN65
130
210
DN80
210
325
DN100
325
510
DN125
510
740
DN150
740
1300
DN200
1300
2080
DN250
Содержание WSAT-YES FC
Страница 1: ...M0NC00002 00 12 20 WSAT YSi...
Страница 2: ...Cool Antifreeze heater Signals Remote On Off Rapid guide CN33 CN24...
Страница 20: ...1 Piping inlet outlet side 2 Electrical panel side 3 Anchoring bolts Size 16 2 24 2 Size 30 2 40 2 1 2 3...
Страница 26: ...Storage tank Option Vent Drain On Off Inverter pump Option...
Страница 34: ...UNITA IN CONFIGURAZIONE MODULARE...
Страница 85: ...85...
Страница 86: ...Via Camp Lonc 25 Z I Villapaiera 32032 Feltre BL Italy Tel 39 0439 3131 Fax 39 0439 313300 info clivet it...