Use
20
if coming from start-up, the generator initially carries out a preparation cycle
(SET-UP) lasting about 30 seconds;
on completing set-up, the generator begins to produce hydrogen, showing the
following page.
e
WARNING: Some parts of the generator contain air at the first start-up. For this
reason, the line should be vented with the hydrogen produced (for at least 20
minutes) before using it for the application.
6.3.
Stopping the generator
At any time during production the generator can be stopped by pressing the
"STOP" button;