![Chrysler IIIH Скачать руководство пользователя страница 73](http://html1.mh-extra.com/html/chrysler/iiih/iiih_assembly-manual_2606268073.webp)
4 While maintaining this alignment, route the cam chain
around the exhaust and intake cam phasers so that the
plated links are aligned with the phaser timing marks
(1). Position the right side cam phasers so that the
arrows (3) point away from each other and the scribe
lines (4) are parallel to the cylinder head cover mounting
surface (6). Press the intake cam phaser onto the intake
cam, install and hand tighten the oil control valve (2).
5 Tighten all four oil control valves to 150 N∙m (110 ft. lbs.).
Do Not Tighten Oil Control Valves without Phaser Locks in position.
6 Remove all phaser locks and tensioner lock pins.
Revision DRAFT
Section
8
Mar‐16
Sheet
13
Long Block Assembly
Timing Chain Assembly
Содержание IIIH
Страница 9: ...Section 3 New Engine Disassembly...
Страница 20: ...Section 4 Main Oil Gallery Modifications and Honing...
Страница 34: ...Section 5 Post Honing and Special Parts Cleaning...
Страница 42: ...Section 6 Cylinder Head Pre Build Cleaning and Assembly...
Страница 46: ...Section 7 Short Block Assembly and General Information...
Страница 60: ...Section 8 Long Block Assembly...
Страница 75: ...Section 9 Final Dress...
Страница 88: ...Crankcase Ventilation Set up views Revision DRAFT Crankcase Ventilation Section 9 Mar 16 Sheet 13...
Страница 89: ...Section 10 OHT Hardware...
Страница 93: ...OHT3H 304 2 Pan Oil Modified Revision DRAFT OH Technologies Section 10 Mar 16 Sheet 4...
Страница 96: ...Section 11 Reagents and Equipment...