![Chrysler IIIH Скачать руководство пользователя страница 10](http://html1.mh-extra.com/html/chrysler/iiih/iiih_assembly-manual_2606268010.webp)
1 2
Remove upper intake manifold (2) fasteners (1)
New engines are received from Chrysler as full assemblies. Upon delivery to the build area, they should be
disassembled and prepared for test. Cylinder heads should be disassembled and the bare heads need to be packaged
for shipment to IMTS for special processing. Packaging from the new cylinder heads to be used for the test should be
used for return of new core materials to IMTS.
Remove the flywheel and disengage the
ignition and fuel injector harness clips on
the upper intake manifold brackets (1).
Remove both upper intake manifold
brackets (2).
Remove PCV vacuum tube from rocker cover to
upper intake manifold.
1
Revision DRAFT
Mar‐16
New Engine Disassembly
Section
Sheet
3
Содержание IIIH
Страница 9: ...Section 3 New Engine Disassembly...
Страница 20: ...Section 4 Main Oil Gallery Modifications and Honing...
Страница 34: ...Section 5 Post Honing and Special Parts Cleaning...
Страница 42: ...Section 6 Cylinder Head Pre Build Cleaning and Assembly...
Страница 46: ...Section 7 Short Block Assembly and General Information...
Страница 60: ...Section 8 Long Block Assembly...
Страница 75: ...Section 9 Final Dress...
Страница 88: ...Crankcase Ventilation Set up views Revision DRAFT Crankcase Ventilation Section 9 Mar 16 Sheet 13...
Страница 89: ...Section 10 OHT Hardware...
Страница 93: ...OHT3H 304 2 Pan Oil Modified Revision DRAFT OH Technologies Section 10 Mar 16 Sheet 4...
Страница 96: ...Section 11 Reagents and Equipment...