![Chrysler IIIH Скачать руководство пользователя страница 29](http://html1.mh-extra.com/html/chrysler/iiih/iiih_assembly-manual_2606268029.webp)
15. Measure
all
cylinder
bore
dimensions
using
the
proper
bore
gauge
specified
in
section
4
sheet
8
of
the
IIIH
Engine
Assembly
Manual
for
both
transverse
and
longitudinal
dimensions
at;
Top
Middle
Bottom
16. Install
the
diamond
stones
in
the
Sunnen
SV
‐
10
Hone
Head.
17. Set
Zero
Cut
Off
Mode
to
“ON”
with
the
Auto
Finish
“OFF”.
Note:
The
Auto
Finish
is
set
to
“OFF”
during
these
first
operations
to
keep
the
honer
from
running
an
extra
“Six
Cycles”
during
the
bore
straightening
process
if
the
machine
were
to
dwell
just
before
the
Zero
Cut
Off.
18. Insert
the
hone
head
into
the
first
cylinder
on
the
right
bank.
Cylinder
#1
19. Using
the
Crown
Wheel
on
the
Hone,
tighten
the
hone
head
until
the
diamond
stones
lightly
contact
the
cylinder
wall
using
a
rocking
motion
to
ensure
the
stones
are
fully
contacting
the
cylinder.
Note:
Each
Technician
must
acquire
the
feel
for
when
the
stones
are
fully
engaged
without
putting
Too
Much
Pressure
on
the
stones
as
to
simulate
a
high
unit
loading.
20. With
the
instruction
in
line
item
19
complete,
set
the
Lower
Crown
Ring
on
the
Hone
Head
to
Zero
Cut
Off.
21. Set
the
lower
ring
to
three
divisions
from
Zero
Cut
Off.
22. Start
the
hone
and
flood
the
cylinder
with
honing
fluid.
Note:
The
honing
fluid
flow
should
be
set
at
7L/min.
23. Engage
the
hone
and
rapidly
put
30
units
load
on
the
stones.
24. Immediately
set
the
lower
ring
to
1
division
(or
slightly
less)
before
Zero
Cut
Off.
Note:
Line
item
instruction
21
is
set
to
three
divisions
to
keep
the
hone
from
shutting
off
while
putting
the
load
on
the
hone
head.
Operators
should
immediately
perform
line
item
instruction
24,
after
setting
the
initial
load
head
to
1
division
before
Zero
Cut
Off,
to
prevent
the
hone
from
removing
too
much
material
on
the
hone
during
the
cylinder
straightening
process.
25. Allow
the
hone
to
run
to
the
shut
off
position
without
adjusting
the
hone
head
pressure.
Note:
The
hone
will
drop
off
on
the
load
and
dwell
as
necessary
throughout
this
operation
at
Top,
Middle,
and
Bottom
positions
to
auto
straighten
the
cylinder
bore
and
shut
off
automatically
at
the
zero
shut
off
point.
26. Repeat
steps
21
through
25
for
each
cylinder
following
the
proper
sequence
(Cylinder
1
–
5
–
4
–
3
–
2
–
6).
27. Upon
completion
of
the
first
pass
through
all
six
cylinders,
let
the
block
cool
for
a
minimum
time
period
of
15
minutes.
Revision
1
Section
4
Jun
‐
18
Sheet
9
Cylinder
Block
Honing
IIIH
Honing
Operations
Содержание IIIH
Страница 9: ...Section 3 New Engine Disassembly...
Страница 20: ...Section 4 Main Oil Gallery Modifications and Honing...
Страница 34: ...Section 5 Post Honing and Special Parts Cleaning...
Страница 42: ...Section 6 Cylinder Head Pre Build Cleaning and Assembly...
Страница 46: ...Section 7 Short Block Assembly and General Information...
Страница 60: ...Section 8 Long Block Assembly...
Страница 75: ...Section 9 Final Dress...
Страница 88: ...Crankcase Ventilation Set up views Revision DRAFT Crankcase Ventilation Section 9 Mar 16 Sheet 13...
Страница 89: ...Section 10 OHT Hardware...
Страница 93: ...OHT3H 304 2 Pan Oil Modified Revision DRAFT OH Technologies Section 10 Mar 16 Sheet 4...
Страница 96: ...Section 11 Reagents and Equipment...