INSTALLATION & SETUP
Roadster/Mirage S+ User’s Manual
2-9
Release and remove (3) safety pins
The safety pins must be removed from the
stacking mounts so that the stacking legs can fit
into the mounts (Figure 2.13).
•
If upright – remove the pins from the mounts
on the bottom projector.
•
If inverted – remove the pins from the
mounts on the top projector.
Place top projector on bottom projector
WARNING
Minimum of 2 people required.
With one person on each side, lift the top projector on to bottom projector, aligning
all three stacking points between projectors. Legs should fit inside stacking mounts.
Align holes in (3) stacking mounts and (3) stacking legs.
On each stacking mount, turn the adjusting wheel slightly until the hole in the top
portion of the mount lines up with the hole in the stacking leg (Figure 2.14).
NOTE:
You can increase leverage by using a screwdriver in the holes.
Figure 2.14. Align Holes in Mounts and Legs, and LOCK with Pin
Insert (3) safety pins and LOCK all
WARNING
Critical Safety Procedure.
At each of the (3) stacking points, insert the safety pin fully through the holes in the
stacking mounts and stacking legs (Figure 2.14). Ensure that each pin is
fully inserted
to
engage the safety lock and secure the projectors together. Failure to engage the safety
lock could cause the projectors to separate and result in injury or death.
STEP
5
'
Figure 2.13. Remove Safety Pins
STEP
6
'
STEP
7
'
STEP
8
'
Содержание Mirage S+
Страница 6: ......
Страница 112: ......
Страница 136: ......
Страница 144: ......
Страница 145: ...Appendix B Keypad Reference Roadster Mirage S User s Manual B 1 Figure B 1 Remote Keypad...
Страница 146: ...KEYPAD REFERENCE B 2 Roadster Mirage S User s Manual Figure B 2 Brick Rental Staging Remote Roadster...
Страница 148: ...SERIAL COMMUNICATION CABLES C 2 Roadster Mirage S User s Manual...
Страница 158: ......