page 3
www.centsys.com
SAFETY
FIRST
IMPORTANT SAFETY INSTRUCTIONS
1.
Glossary of terms
2.
Product identification
2.1
Internal components
2.2
External components
2.3
Electronics tray
2.4
Hardware unpacking
3.
Physical installation
3.1
Orientation of the
SECTOR II
3.2
Preparation of the cabinet plinth
3.3
Mounting the cabinet
3.4
Fitting and levelling the boom pole
4.
Onsite electrical wiring
4.1
AC and DC power isolation
4.2
Earthing the unit
4.3
Wiring AC power to the
SECTOR II
Traffic Barrier
4.4
Installing loop detectors
4.4.1 Installing a single FLUX SA loop detector
4.4.2 Installing dual FLUX SA loop detectors
5.
Basic controller setup
5.1
Powering up the
SECTOR II
5.2
Programming the controller
6.
Installation handover
7.
Advanced controller setup
7.1
Menu navigation map
Installation flow diagram: Center-fold pull-out
8. Maintenance
8.1
How and when to do maintenance
8.2
Site related issues
page 7
page 8
page 8
page 9
page 9
page 10
page 11
page 11
page 12
page 13
page 14
page 17
page 18
page 18
page 18
page 19
page 19
page 21
page 23
page 23
page 23
page 27
page 29
page 30
page 39
page 47
page 47
page 49
page 5
Contents
Содержание SECTOR II
Страница 82: ...page 82 www centsys com Notes...
Страница 83: ...page 83 www centsys com Notes...