![CENTURION SYSTEMS SECTOR II Скачать руководство пользователя страница 15](http://html1.mh-extra.com/html/centurion-systems/sector-ii/sector-ii_installation-manual_2582979015.webp)
page 15
www.centsys.com
FIGURE 14
FIGURE 15
Step 5
Insert the boom pole retainer and
locate the threaded studs in the
drilled holes.
Drilling machine
8.5mm drill bit
Boom pole
Boom pole retainer
Step 4
Drill two 8.5mm holes.
Holes must be drilled
through only one wall of
the boom pole.
PHYSICAL INSTALLATION
SECTION 3
FIGURE 16
Step 6
Fasten the boom pole as shown and
replace the end cap (Figure 16).
Boom pole
M8 Nut
M8 Spring
washer
Threaded
stud
Coupler
in vertical
position
End Cap
Содержание SECTOR II
Страница 82: ...page 82 www centsys com Notes...
Страница 83: ...page 83 www centsys com Notes...