![CENTURION SYSTEMS SECTOR II Скачать руководство пользователя страница 14](http://html1.mh-extra.com/html/centurion-systems/sector-ii/sector-ii_installation-manual_2582979014.webp)
page 14
www.centsys.com
Step 5
Ensure the hold-down bracket is the
right way up before securing it in
position (Figure 11).
Bolt the hold-down bracket in
position to clamp the barrier onto
the plinth (Figure 12).
If there is a need to install
the
SECTOR II
barrier in the
left-hand configuration and
it has not been pre-ordered,
keep the barrier bolted in
place. Refer to Appendix 2 -
Changing a unit to a
left-hand configuration
FIGURE 11
FIGURE 12
Barrier
hold-down
stud
Nut
Heavy duty
Washer
(Supplied)
Hold-down
bracket
PHYSICAL INSTALLATION
SECTION 3
3.4. Fitting and levelling the boom pole
FIGURE 13
3.4.1. Fitting the pole
Step 1
Carefully remove the end cap from
one end of the boom pole.
Step 2
Use the retainer assembly to mark a
line along the pole.
Step 3
From the edge of the pole, mark and
centre punch the hole positions at
65mm and 175mm (Figure 13).
Marking pen
Boom pole
Boom pole retainer
65mm
175mm
Содержание SECTOR II
Страница 82: ...page 82 www centsys com Notes...
Страница 83: ...page 83 www centsys com Notes...