
Microswitch installation
2
4
1
3
2
4
3
1
Microswitch position when the lower boiler door opens on right side (factory)
Microswitch position when the lower boiler door opens on left side
Microswitch holder
Microswitch holder
Microswitch position
when the lower boiler
door opens on right
side (factory)
Microswitch position
when the lower boiler
door opens on left side
At standard delivery (lower boiler door opens on right side) microswitch is installed on front lower
side of boiler casing cover (casing cover side have prepared holes for installing microswitch with
holder).
At installation on boiler on which is changed lower boiler door opening direction (lower boiler door
opens on left side) is necessary to dismantle microswitch from holder (it’s fasten to holder with two
screw and two nuts), rotate it on opposite drection and fasten it with same screws and nuts.
After that, microswitch is install to lower front right side of boiler casing cover (casing cover side have
prepared holes for installing microswitch).
Microswitch installation
Technical instructions CONTROLLER -
CPREG-Touch
8