
Legend:
1.
pellet burner CPPL-90
2.
tube for conne cting of pellet feeding flexible tube
3.
flame tube extension
4.
Backfilling sensor / temperature gauge on inlet tub e that
is installed tube for connecting of pellet feeding flexible
tube (backfilling sensor is detailed in the Technical instructions
for use and maintenance)
5.
burner cover
6.
plastic and silicone pressure switch pipe
7.
feeder with electric motor CPPT-90
8.
pellet feeder flexible tube
9.
pelet tank CPSP-800
10.
cover of opening for filling the pellet tank
11.
lower lid for tank cleaning
12.
opening for pellet feeder
13.
openings for tank cleaning
15.
connector for pressure switch silicone pipe on the lower boiler door CPDV
16.
boiler control unit CPREG-Touch
17.
micro switch for lower boiler door
400
370
240
370
3
14. a) set for installation of pellet burner (only new boiler models)
14. b) lower boiler door adapted for pellet burner CPDV 60/70
for burner CPPL-90 (for boilers EKO-CK P 60 and 70) and CPDV 90/110
(for boilers EKO-CK P 90) (only old boiler models)
b
14a
80°C
120°C
0%
1700
15k
30%
60°C
70°C
50°C
55°C
Technical instructions CONTROLLER -
CPREG-Touch
5
Equipment components