![CBE 520 Скачать руководство пользователя страница 60](http://html.mh-extra.com/html/cbe/520/520_safety-installation-operation-maintenance_2575513060.webp)
60
Timer Function Explanations:
Pre-Bag Inflate
This timer is used to control the duration that the bag inflation blower runs to inflate the bag
at the beginning of each bag fill. It is adjusted in 0.1 second increments. Factory setting is
20 seconds.
Vibratory / Densifier On Delay
This is an on-delay timer used to allow material to get into the bag, before turning on the
bag densification system. It is adjusted in 0.1 second increments. Factory setting is 20
seconds.
Input / Output Screen
The PLC screen displays which inputs and outputs are signaling on and off at any point
during the bag filling process. They are “on” when they are gray color or lite.
Содержание 520
Страница 1: ...1 CBE 520 BULK BAGGER Safety Installation Operation Maintenance ...
Страница 10: ...10 CHAPTER 1 General Information ...
Страница 14: ...14 CHAPTER 2 INSTALLATION GUIDE ...
Страница 18: ...18 CHAPTER 3 LOAD CELL WIRING ...
Страница 22: ...22 Figure 3 500 Series Bottom View ...
Страница 23: ...23 CHAPTER 4 COMPONENT DESCRIPTION ...
Страница 26: ...26 CBE DENSIFYING DECK ...
Страница 27: ...27 CHAPTER 5 OPERATIONAL SEQUENCE ...
Страница 33: ...33 CHAPTER 6 Conveyors Setup ...
Страница 38: ...38 CHAPTER 7 PLC and Timers and Adjustments ...
Страница 43: ...43 CHAPTER 8 WEIGH CONTROLLER And ADJUSTMENTS ...
Страница 45: ...45 ...
Страница 48: ...48 See attached Documentation For the Controller specifically Used on your machine ...
Страница 49: ...49 Chapter 9 MAINTENANCE ...
Страница 51: ...51 CHAPTER 10 TROUBLESHOOTING ...
Страница 55: ...55 ...
Страница 56: ...56 CHAPTER 11 STANDARD ILUSTRATED PARTS See attached documentation for Other parts Specific to Your Bagger ...
Страница 57: ...57 CHAPTER 12 PLC and TIMER ADJUSTMENTS ...
Страница 61: ...61 DRAWINGS AND SCHEMATICS See attached Schematics And Drawings specific for your machine ...