![CBE 520 Скачать руководство пользователя страница 46](http://html.mh-extra.com/html/cbe/520/520_safety-installation-operation-maintenance_2575513046.webp)
46
ADJUSTING PREACT
To adjust the PreAct, use the same procedure as you would to get to target weight. Just
advance to the next step
by pressing the “0” / zero key. Next up is “Preact“. Preact is the
value amount you enter when you put the filled bag on the floor scale. Exam: The Bag
weighs 52# and target weight is 50. You would enter minus 2# in Preact.
Setting the Motion Delay
◙ Press 100 <
SELECT
> 23640 <
TIMERS & ADJUST
> <
ENTER
>
◙ Press 114 <
SELECT
> to display P114. This is defaulted at 0.5 s or 1.0 s. To turn
this setting off, press 0<
ENTER
>. NOTE: This WILL turn off ANY motion delays in
the program. At the end of some of the CBE programs, there are motion delays to
get the most accurate reading. Turning off the window MAY affect final readings.
◙ After making a change to P114, press <
SELECT
> to be sure that the setting is
saved.
◙ To
exit
out
of
setup
and
save
the
changes,
press
<
ZERO
>
<
CLR
><
ENTER
><
ENTER
>.
Troubleshooting
◙ If nothing is working/running as expected, press <
SELECT
> until Mname Test is
displayed, and press <
ENTER
>. This is a test procedure that should fire any
required set points for the bagging system's operation.
◙ If the start process has begun, but none of the relays are firing, (if installed, press the
STOP key until ABORT is displayed on the indicator) check variable 20, and make
sure it is blank.
◙ To do this, press 80.20<
SELECT
>. Check the value of the variable, if there is
anything stored; press <
CLR
> to clear it out.
◙ If this is blank, cycling power on the indicator will reset any variables that contain
setting for the indicator to run the process.
Troubleshooting
◙ For Code 02 Underload, Code 03 Overload or Code 08 Check Conn., check load cell
connection FIRST!
Содержание 520
Страница 1: ...1 CBE 520 BULK BAGGER Safety Installation Operation Maintenance ...
Страница 10: ...10 CHAPTER 1 General Information ...
Страница 14: ...14 CHAPTER 2 INSTALLATION GUIDE ...
Страница 18: ...18 CHAPTER 3 LOAD CELL WIRING ...
Страница 22: ...22 Figure 3 500 Series Bottom View ...
Страница 23: ...23 CHAPTER 4 COMPONENT DESCRIPTION ...
Страница 26: ...26 CBE DENSIFYING DECK ...
Страница 27: ...27 CHAPTER 5 OPERATIONAL SEQUENCE ...
Страница 33: ...33 CHAPTER 6 Conveyors Setup ...
Страница 38: ...38 CHAPTER 7 PLC and Timers and Adjustments ...
Страница 43: ...43 CHAPTER 8 WEIGH CONTROLLER And ADJUSTMENTS ...
Страница 45: ...45 ...
Страница 48: ...48 See attached Documentation For the Controller specifically Used on your machine ...
Страница 49: ...49 Chapter 9 MAINTENANCE ...
Страница 51: ...51 CHAPTER 10 TROUBLESHOOTING ...
Страница 55: ...55 ...
Страница 56: ...56 CHAPTER 11 STANDARD ILUSTRATED PARTS See attached documentation for Other parts Specific to Your Bagger ...
Страница 57: ...57 CHAPTER 12 PLC and TIMER ADJUSTMENTS ...
Страница 61: ...61 DRAWINGS AND SCHEMATICS See attached Schematics And Drawings specific for your machine ...