![CBE 520 Скачать руководство пользователя страница 47](http://html.mh-extra.com/html/cbe/520/520_safety-installation-operation-maintenance_2575513047.webp)
47
◙ If correctly connected, try a Calibration Reset. Press <
CAL
> and when "FirstZero?"
is displayed press <
SELECT
> until Cal Reset is displayed. Press <
ENTER
> to reset
and recalibrate the indicator.
◙ If Calibration Reset does NOT work, hook a load cell simulator up to the indicator to
test and make sure indicator is working correctly.
Troubleshooting
◙ If load cell simulator works fine, hook the load cell back up to the indicator.
◙ Go into setup: 100<
SELECT
>23640<
TIMERS
& ADJUST
><
ENTER
>
◙ Key in 110<
SELECT
> and enter a weight HIGHER than currently in the indicator. If
100 lbs, set to 250. To do this, just key in the desired weight and press <
ENTER
>.
◙ Once the desired weight is entered, press <
ZERO
>, when prompted "Enter=Cal!"
press <
ENTER
> and proceed through calibration.
◙ Once calibrated, if "Cal good?" displays on indicator, press <
ENTER
> through
remaining prompts.
Troubleshooting
◙ Once back in weigh mode, re-enter setup and go back to parameter 110.
◙ Change the newly keyed in value back to original weight value, and proceed to
calibrate once again by pressing <
ZERO
> and <
ENTER
> to re-
calibrate.
◙ USE THE NEXT STEPS AS A LAST RESORT!
◙ If this still does NOT fix the issue, the indicator MAY need to be defaulted at P65001.
Key in 100<
SELECT
>23640<
TIMERS & ADJUST
><
ENTER
> to enter setup.
◙ Key in 65001<
SELECT
> to get "Defit All" and press <
ENTER
> through the prompts.
◙ The program will NEED to be reloaded and the indicator re-calibrated.
Содержание 520
Страница 1: ...1 CBE 520 BULK BAGGER Safety Installation Operation Maintenance ...
Страница 10: ...10 CHAPTER 1 General Information ...
Страница 14: ...14 CHAPTER 2 INSTALLATION GUIDE ...
Страница 18: ...18 CHAPTER 3 LOAD CELL WIRING ...
Страница 22: ...22 Figure 3 500 Series Bottom View ...
Страница 23: ...23 CHAPTER 4 COMPONENT DESCRIPTION ...
Страница 26: ...26 CBE DENSIFYING DECK ...
Страница 27: ...27 CHAPTER 5 OPERATIONAL SEQUENCE ...
Страница 33: ...33 CHAPTER 6 Conveyors Setup ...
Страница 38: ...38 CHAPTER 7 PLC and Timers and Adjustments ...
Страница 43: ...43 CHAPTER 8 WEIGH CONTROLLER And ADJUSTMENTS ...
Страница 45: ...45 ...
Страница 48: ...48 See attached Documentation For the Controller specifically Used on your machine ...
Страница 49: ...49 Chapter 9 MAINTENANCE ...
Страница 51: ...51 CHAPTER 10 TROUBLESHOOTING ...
Страница 55: ...55 ...
Страница 56: ...56 CHAPTER 11 STANDARD ILUSTRATED PARTS See attached documentation for Other parts Specific to Your Bagger ...
Страница 57: ...57 CHAPTER 12 PLC and TIMER ADJUSTMENTS ...
Страница 61: ...61 DRAWINGS AND SCHEMATICS See attached Schematics And Drawings specific for your machine ...