![CBE 520 Скачать руководство пользователя страница 19](http://html.mh-extra.com/html/cbe/520/520_safety-installation-operation-maintenance_2575513019.webp)
19
LOAD CELL WIRING TO JUNCTION BOX
The four (4) load cells are each wired to their respective terminals in the junction box according to
the corner numbering system shown in
Figure 1
below. See
Figure 2 (below)
for junction box
layout and wiring connections. If equipped, tighten the strain relief hubs on the junction box with a
wrench to assure proper seal.
Figure 1: Load Cell Configuration
Figure 2: Junction Box Connections
Take the cable coming from the junction box of the 500 series and wire it to the controller indicator
as follows:
Содержание 520
Страница 1: ...1 CBE 520 BULK BAGGER Safety Installation Operation Maintenance ...
Страница 10: ...10 CHAPTER 1 General Information ...
Страница 14: ...14 CHAPTER 2 INSTALLATION GUIDE ...
Страница 18: ...18 CHAPTER 3 LOAD CELL WIRING ...
Страница 22: ...22 Figure 3 500 Series Bottom View ...
Страница 23: ...23 CHAPTER 4 COMPONENT DESCRIPTION ...
Страница 26: ...26 CBE DENSIFYING DECK ...
Страница 27: ...27 CHAPTER 5 OPERATIONAL SEQUENCE ...
Страница 33: ...33 CHAPTER 6 Conveyors Setup ...
Страница 38: ...38 CHAPTER 7 PLC and Timers and Adjustments ...
Страница 43: ...43 CHAPTER 8 WEIGH CONTROLLER And ADJUSTMENTS ...
Страница 45: ...45 ...
Страница 48: ...48 See attached Documentation For the Controller specifically Used on your machine ...
Страница 49: ...49 Chapter 9 MAINTENANCE ...
Страница 51: ...51 CHAPTER 10 TROUBLESHOOTING ...
Страница 55: ...55 ...
Страница 56: ...56 CHAPTER 11 STANDARD ILUSTRATED PARTS See attached documentation for Other parts Specific to Your Bagger ...
Страница 57: ...57 CHAPTER 12 PLC and TIMER ADJUSTMENTS ...
Страница 61: ...61 DRAWINGS AND SCHEMATICS See attached Schematics And Drawings specific for your machine ...