![CBE 520 Скачать руководство пользователя страница 52](http://html.mh-extra.com/html/cbe/520/520_safety-installation-operation-maintenance_2575513052.webp)
52
Controller Does Not Return to “0.00”
This is typical a mechanical problem with the scale. Check the following areas which can
influence the scale.
o
Check load cell feet to make sure that all 4 feet are firmly touching the floor.
o
Check for bad Load cell – Check ohms of each load cell to see if they are in proper
spec. Check chart on page 56
o
Check Load Cell Connections.
o
Check alignment of load cell so the weight is pushing straight down and not on an
angle. Adjust or align as required.
o
Check to see if any load cells are loose. Adjust and re- tighten as required
o
Check for Binding where the dust collection hookup connects in the Filler head area.
o
Check for possible buildup of material between the filler head and the dust collector
pipe.
o
Check for possible material buildup between the floor and the main frame.
o
Check for influences from airlines that may be too tight pulling on the scale.
o
Check for loose bolts on the load cell: Inspect and tighten as required.
Erratic Weights
o
Erratic material flows from supply bin due to not maintaining a consistent head
pressure of material above the packer causing inconsistent flow
o
Controller dribble weight setting is too close to the final cutoff weight setting.
Increase dribble weight setting.
o
Mechanical dribble setting on slide gate is open too far. Adjust the reed sensor on
slide gate cylinder.
o
Loose Load Cell- Inspect and adjust as needed.
o
Bad Load cell – Check Ohms on each load cell to see if they are in spec. Check
against chart
Содержание 520
Страница 1: ...1 CBE 520 BULK BAGGER Safety Installation Operation Maintenance ...
Страница 10: ...10 CHAPTER 1 General Information ...
Страница 14: ...14 CHAPTER 2 INSTALLATION GUIDE ...
Страница 18: ...18 CHAPTER 3 LOAD CELL WIRING ...
Страница 22: ...22 Figure 3 500 Series Bottom View ...
Страница 23: ...23 CHAPTER 4 COMPONENT DESCRIPTION ...
Страница 26: ...26 CBE DENSIFYING DECK ...
Страница 27: ...27 CHAPTER 5 OPERATIONAL SEQUENCE ...
Страница 33: ...33 CHAPTER 6 Conveyors Setup ...
Страница 38: ...38 CHAPTER 7 PLC and Timers and Adjustments ...
Страница 43: ...43 CHAPTER 8 WEIGH CONTROLLER And ADJUSTMENTS ...
Страница 45: ...45 ...
Страница 48: ...48 See attached Documentation For the Controller specifically Used on your machine ...
Страница 49: ...49 Chapter 9 MAINTENANCE ...
Страница 51: ...51 CHAPTER 10 TROUBLESHOOTING ...
Страница 55: ...55 ...
Страница 56: ...56 CHAPTER 11 STANDARD ILUSTRATED PARTS See attached documentation for Other parts Specific to Your Bagger ...
Страница 57: ...57 CHAPTER 12 PLC and TIMER ADJUSTMENTS ...
Страница 61: ...61 DRAWINGS AND SCHEMATICS See attached Schematics And Drawings specific for your machine ...