![CBE 520 Скачать руководство пользователя страница 5](http://html.mh-extra.com/html/cbe/520/520_safety-installation-operation-maintenance_2575513005.webp)
5
WARNINGS AND NOTICES
WARNING
The purpose of this section is to alert operating and maintenance personnel to the possible dangers
of this type of equipment. Serious injury and/or equipment damage could result from not heeding
these safety precautions.
BEFORE OPERATING EQUIPMENT:
1.
Any personnel working directly with or on this equipment should read this manual before
proceeding with equipment use.
2.
Electricians should familiarize themselves with the electrical drawings before initial start-up
of equipment.
3.
Other appropriate operating and maintenance personnel should familiarize themselves with
mechanical layout and general arrangement drawings before start-up of equipment.
4.
Determine location of all emergency switches.
5.
Be sure all guards are in place and observe all warning signs.
6.
Be sure electrical equipment is free of any accumulation of water.
7.
Be sure all personnel are clear of operating mechanisms before connecting air.
8.
Never start equipment without first checking for loose objects, tools and trash. All persons
in the immediate area of the equipment should be alerted prior to starting.
WHEN OPERATING EQUIPMENT:
1.
Do not open junction boxes or control panels unless you are a qualified electrician. Be
sure power is off. Except when electricians are performing maintenance, electrical
enclosures and junction boxes should always be securely closed.
2.
Stop machine and disconnect power before servicing or repairing. Maintenance and
adjustments must be performed with all power disconnected unless otherwise specified in
this manual.
3.
Do not attempt to defeat any safety switches. Serious injury could result.
4.
While machine control power is on, do not activate limit switches manually. Serious injury
and/or machine damage could result. Disable machine before attempting any maintenance
or manual testing of components.
5.
Motors will get warm to the touch and should not cause concern for equipment reliability and
operation. A temperature rise is normal per new NEMA specifications.
Содержание 520
Страница 1: ...1 CBE 520 BULK BAGGER Safety Installation Operation Maintenance ...
Страница 10: ...10 CHAPTER 1 General Information ...
Страница 14: ...14 CHAPTER 2 INSTALLATION GUIDE ...
Страница 18: ...18 CHAPTER 3 LOAD CELL WIRING ...
Страница 22: ...22 Figure 3 500 Series Bottom View ...
Страница 23: ...23 CHAPTER 4 COMPONENT DESCRIPTION ...
Страница 26: ...26 CBE DENSIFYING DECK ...
Страница 27: ...27 CHAPTER 5 OPERATIONAL SEQUENCE ...
Страница 33: ...33 CHAPTER 6 Conveyors Setup ...
Страница 38: ...38 CHAPTER 7 PLC and Timers and Adjustments ...
Страница 43: ...43 CHAPTER 8 WEIGH CONTROLLER And ADJUSTMENTS ...
Страница 45: ...45 ...
Страница 48: ...48 See attached Documentation For the Controller specifically Used on your machine ...
Страница 49: ...49 Chapter 9 MAINTENANCE ...
Страница 51: ...51 CHAPTER 10 TROUBLESHOOTING ...
Страница 55: ...55 ...
Страница 56: ...56 CHAPTER 11 STANDARD ILUSTRATED PARTS See attached documentation for Other parts Specific to Your Bagger ...
Страница 57: ...57 CHAPTER 12 PLC and TIMER ADJUSTMENTS ...
Страница 61: ...61 DRAWINGS AND SCHEMATICS See attached Schematics And Drawings specific for your machine ...