![CBE 520 Скачать руководство пользователя страница 25](http://html.mh-extra.com/html/cbe/520/520_safety-installation-operation-maintenance_2575513025.webp)
25
10. 501- 700 Power Fill
Head Height Adjustment
501-700
Pneumatically Operated Adjustment of Bag Holding Arms and Fill Head.
Allows Operator to Quickly and Easily Adjust Filler for Multiple Bag Heights
To a Precise Preset Location without the Use of a Forklift. Through the
Operator Controls, It Automatically Raises and Lowers the Fill Head and
Holder Arms with a Toggle Valve to Set the Fill Height Position.
0
11. Bulk and Dribble
12”filler head Assembly,
Slidegate, with bulk and
dribble (304 stainless )
503-2300
3-position (full open, partially open, full closed) pneumatically operated slide
gate assembly designed to increase the potential weight accuracy of the
Model 500 by delivering the majority of a bag weighment in a "bulk" or fast
fill mode then slowing to a "dribble" or slow fill mode to finish off the fill cycle
At a precise weight. The intermediate valve position is adjustable to allow for
Pinpoint control over product flow and ensure precision weight accuracy.
12. Pre-bag Inflate
511-100
Low Pressure / High Volume Regenerative Blower Bag Inflation Assembly
Designed to Fully Inflate and Expand Empty Bags with on the Filler Before
They are Filled to Ensure that the Bag Has Fully Opened. Greatly Improves
Visual Appearance and Stability of the Filled Bags. Integrated Motor
Controls Included and Pre-wired. 220/440 Volt / 3 Ph / 60 Cycle NOTE: This
Assembly Generates 90 CFM @ 2 PSIG.
13. Switching Service air
control Valve Assy
511-200
Allows Lined Bags that are Not Capable of Breathing through the Wall of the
Bag to be Vented to Dust Collection through a Scale Isolated Vent Assembly
with Bi-Direction Pneumatic Valving that Allows Dust Collection and Pre-Fill
Bag Inflation through the Same Filling Head. The Fill Head is Bi-Directional
Meaning that It Allows Blower Air from the Inflator and Dust Collection to be
Channeled through the Filling Head Automatically Cycled On and Off by the
Controls of the Filler.
14.
5” Powered Bulk Bag
Accumulation Conveyor
514-100
Transfer Conveyor that is used to Index the Filled Bag through Additional
Steps in the Packaging Process After the Bag is Filled and Discharged from
the CBE 500 Filler.
15.Fill head Mast
Extensions
516-100
Adder for Fill Head Mast Extensions and Bracing that Allow the CBE 510 to
Fill Bulk Bags Up to 80" (200 cm) Overall Height (the Standard Unit is
Designed to Handle Bags of 66" (167 cm) Overall Height
16. Automated Pallet
Dispenser
521-100
Pallet Dispenser Designed to Dispense Single Pallets from a Stack, onto a
Conveyor, into a Palletizer or Other Type of System. This Design Lifts and
Suspends the Pallet Stack while a Pallet Pusher Squares and Indexes the
Bottom Pallet as it Feeds it to the Next Operation. * Automatically Dispenses
or Stacks 3 Pallets per Minute * Standard Stack Height Capacity: Up to 12
Same Size Pallets * Fully Welded Heavy-Duty Construction for 24/7
Operation Shipped Pre-Piped and Wired * Air Operated Pallet Lift for Pallet
Stack Manipulation * PLC Controlled * Fabricated of Structural Steel and
Steel Plate * Factory tested
Operator Mezzanine
For a 520
522-100
Heavy Duty Operator's Mezzanine Constructed of Heavy Box Tubing,
C-Channel and Bar Grating. CBE Filler Controls and Start / Stop push
Buttons Mounted and Integrated on Quick Disconnect Pin Connectors for
Easy Field Installation.
Automatic Slip Sheet
Dispenser
523-100
Automatically Discharges Slip Sheets from a Storage Tray and Positions
them onto Incoming Pallets Being Cycles into the System by the Pallet
Dispenser. Includes All Electrical, Pneumatic and Vacuum Controls.
Содержание 520
Страница 1: ...1 CBE 520 BULK BAGGER Safety Installation Operation Maintenance ...
Страница 10: ...10 CHAPTER 1 General Information ...
Страница 14: ...14 CHAPTER 2 INSTALLATION GUIDE ...
Страница 18: ...18 CHAPTER 3 LOAD CELL WIRING ...
Страница 22: ...22 Figure 3 500 Series Bottom View ...
Страница 23: ...23 CHAPTER 4 COMPONENT DESCRIPTION ...
Страница 26: ...26 CBE DENSIFYING DECK ...
Страница 27: ...27 CHAPTER 5 OPERATIONAL SEQUENCE ...
Страница 33: ...33 CHAPTER 6 Conveyors Setup ...
Страница 38: ...38 CHAPTER 7 PLC and Timers and Adjustments ...
Страница 43: ...43 CHAPTER 8 WEIGH CONTROLLER And ADJUSTMENTS ...
Страница 45: ...45 ...
Страница 48: ...48 See attached Documentation For the Controller specifically Used on your machine ...
Страница 49: ...49 Chapter 9 MAINTENANCE ...
Страница 51: ...51 CHAPTER 10 TROUBLESHOOTING ...
Страница 55: ...55 ...
Страница 56: ...56 CHAPTER 11 STANDARD ILUSTRATED PARTS See attached documentation for Other parts Specific to Your Bagger ...
Страница 57: ...57 CHAPTER 12 PLC and TIMER ADJUSTMENTS ...
Страница 61: ...61 DRAWINGS AND SCHEMATICS See attached Schematics And Drawings specific for your machine ...