![CBE 520 Скачать руководство пользователя страница 50](http://html.mh-extra.com/html/cbe/520/520_safety-installation-operation-maintenance_2575513050.webp)
50
MAINTENANCE OF THE BAG SEAL CUFF AND GAUGE:
Periodic inspection of the bag seal cuff for cracks or tears is necessary. Replacement of the
cuff is recommended if any wear, tears or thinning is noticed.
The pressure gauge should for the bag seal cuff should be kept in good working order. If the
gauge does not read pressure, remove and replace it as soon as possible to prevent cuff
damage.
MAINTENANCE OF POWERED LIVE ROLLER BAG DISCHARGE CONVEYORS:
Check oil levels in gearboxes once a year
Check LRC once a year and remove slack in the chains as required.
Grease bearings once a week or depending on usage.
Grease Vibrators 1-2 shots per month
– they are sealed so over greasing will
damage the vibrators.
Check the chain once a year. Adjust as needed.
GEAR BOXES OF CONVEYING SYSTEM
Check oil levels once a year.
Change oil every 2 years.
BULK BAG INFLATOR / EXHAUST SYSTEM
Check plungers of the 3-way valves once a year for wear
Check and clean air filter once a month OF LPB
Содержание 520
Страница 1: ...1 CBE 520 BULK BAGGER Safety Installation Operation Maintenance ...
Страница 10: ...10 CHAPTER 1 General Information ...
Страница 14: ...14 CHAPTER 2 INSTALLATION GUIDE ...
Страница 18: ...18 CHAPTER 3 LOAD CELL WIRING ...
Страница 22: ...22 Figure 3 500 Series Bottom View ...
Страница 23: ...23 CHAPTER 4 COMPONENT DESCRIPTION ...
Страница 26: ...26 CBE DENSIFYING DECK ...
Страница 27: ...27 CHAPTER 5 OPERATIONAL SEQUENCE ...
Страница 33: ...33 CHAPTER 6 Conveyors Setup ...
Страница 38: ...38 CHAPTER 7 PLC and Timers and Adjustments ...
Страница 43: ...43 CHAPTER 8 WEIGH CONTROLLER And ADJUSTMENTS ...
Страница 45: ...45 ...
Страница 48: ...48 See attached Documentation For the Controller specifically Used on your machine ...
Страница 49: ...49 Chapter 9 MAINTENANCE ...
Страница 51: ...51 CHAPTER 10 TROUBLESHOOTING ...
Страница 55: ...55 ...
Страница 56: ...56 CHAPTER 11 STANDARD ILUSTRATED PARTS See attached documentation for Other parts Specific to Your Bagger ...
Страница 57: ...57 CHAPTER 12 PLC and TIMER ADJUSTMENTS ...
Страница 61: ...61 DRAWINGS AND SCHEMATICS See attached Schematics And Drawings specific for your machine ...