4127 • 42 Super Sport 4/06
55
INTERNAL SYSTEMS
SECTION 4
6. On the AC Control Center:
a. Switch the Air Conditioning System Water Pump circuit breaker “ON.”
b. Switch the desired Air Conditioning Unit circuit breakers “ON.”
7. Verify that seawater is being pumped through the air conditioning units.
As the seawater exits the units, it flows out of a single discharge thru-hull
fitting. Refer to Section 9 - Thru-Hull Fittings for the exact location of this
thru-hull fitting.
8. Use the controls for each air conditioning unit to set the desired temperature.
The controls are located in the salon and master stateroom. Refer to the
OEM information for details on operating the air conditioning controls.
Fresh Water System
The capacity of your boat’s fresh water system is approximately 90 gallons. The
water is divided between two 45-gallon fresh water tanks. The water tanks are
located in the engine room. Refer to the diagram on the next page for the exact
location of the water tanks for the IPS system. For the Inboard system the tanks
are located in the day hatch.
Filling The Water Tank
The fresh water tank is filled through a single deck fitting with a plate labeled
“WATER.” The plate is located in the cockpit on the second step. Refer to
Section 9 - Deck Plates for the exact location of this plate.
NOTE:
Thoroughly flush and sanitize the water system before initial use and at least
once each season.
Do not overfill the water tank or leave the fill hose unattended while the
tank is being filled. Overfilling the tank could cause it to rupture.
Put only clean, fresh water into your water tank. The tank is full when water is
discharged from the water tank vent installed through your boat’s hull. Refer to
the Fresh Water System diagram on the next page for the location of the water
tank vent.
Pressurizing and Priming the Water System
Perform the following ONLY after the fresh water tank is full.
1. Turn the Accessory Battery master disconnect switch to the “ON” position.
2. On the Safety Breaker Panel, make sure the Auto Sump circuit breaker is
“ON,” then switch the Main - One circuit breaker “ON.”
3. Partially open all cold water faucets, including the faucets for the optional
transom hand shower and bow and transom fresh water washdowns.
4. On the DC Control Center, switch the System DC Main circuit breaker
“ON,” then switch the Pressure Water Pump circuit breaker “ON.” This
activates the boat’s pressure water pump, which pressurizes the water system.
The pump is located in the engine room, aft of the port batteries. Refer to
the Fresh Water System diagram on the next for the exact location of the
water pump in the IPS system. The location of the pump in the Inboard
system is in the port aft corner of the day hatch.
Содержание 42 SUPER SPORT
Страница 1: ...HIN CDR _________________ 42 Super Sport Owner s Guide 2006 Version 1...
Страница 2: ......
Страница 4: ......
Страница 6: ......
Страница 8: ......
Страница 28: ......
Страница 44: ...32 4127 42 Super Sport 4 06 DC ELECTRICAL SYSTEM SECTION 2 DC Wiring Schematic 4127 321 014 2 11 21 05...
Страница 46: ...34 4127 42 Super Sport 4 06 DC ELECTRICAL SYSTEM SECTION 2 Gas Electrical Schematic 4127 321 020 1 12 7 05...
Страница 63: ...4127 42 Super Sport 4 06 51 AC ELECTRICAL SYSTEM SECTION 3 AC Wiring Schematics 4127 321 015 1 11 3 05...
Страница 64: ......
Страница 94: ......
Страница 118: ......
Страница 132: ......
Страница 140: ...128 4127 42 Super Sport 4 06 WARRANTY AND PARTS SECTION 9 Bill of Material...
Страница 141: ...4127 42 Super Sport 4 06 129 WARRANTY AND PARTS SECTION 9 Carver Limited Warranty...