14
40 mm
M8
A
B
C
65
4
3
5
2
1
5
300
130
4
s "EFORESTARTINGTHEINSTALLATIONMAKESURETHATTHESTRUCTUREWHICHISTOBEAUTO
-
mated is in good working order and respects the local standards and regulations
in force. To this end ensure that:
- The surface of the sliding gate "
A
" is smooth and has no protrusions up to a
distance of
2,5 metres
from ground level. Protrusions on the gate surface which
are not greater than
3 mm
and have rounded edges are acceptable. If the surface
of the gate is not smooth, the entire height up to
2,5 metres
must be protected
by two of the following devices:
a)
photoelectric cells
b)
contact safety buffer
- the distance "
B
" between the fixed parts and sliding parts of the installation must
not exceed
15 mm
.
- the runner guide "
C
", preferably round, should be securely fixed to the ground,
completely exposed and free of any imperfections which could inhibit the correct
movement of the gate.
- when the gate is closed a space of
50 mm
"
D
" must remain for the entire height
of the front part of the gate and a mechanical travel limit "
E
" must be positioned
on the upper part of the gate.
The free space "
D
" can be covered with a rubber anti-crush buffer "
F
" or better
still a pneumatic or photoelectric contact safety buffer.
- if the gate slides past a fixed structure "
G
" which has railings or bars leaving
open spaces, it must be protected in one of the following ways:
1
) distance "
H
" greater than
500 mm
: no protection required;
2
) distance "
H
" between
500
and
300 mm
: wire mesh fencing "
I
" or punched
metal plating "
L
" with an opening which does not allow the passage of a
25 mm
diameter sphere "
M
" must be fitted;
3
) distance "
H
" smaller than
300 mm
: wire mesh fencing "
I
" or punched metal
plating "
L
" with an opening which does not allow the passage of a
12 mm
diameter sphere "
M
" must be fitted. The wires of the mesh "
I
" must not have a
cross-section of less than
2,5 mm
2
and the punched metal plating "
L
" must not
have a thickness of less than
1.2 mm
. Protection is not necessary for the area
"
P
" if the fixed structure with railings or bars is over
2,5 m
above the ground.
- check the gate components, replace any worn or damaged parts and then
lubricate them.
- using a spirit level "
N
" check that the castor guide is in square.
- the upper runner guide "
O
" must have the correct play for the gate and must not
inhibit the gate's sliding action.
Caution!
It is the installer's responsibility to check all critical
danger points, to take action and to install any devices needed
to guarantee the safety of all people using the gate (risk analysis).
Caution!
Check that a mechanical travel limit (absolutely necessary)
has been fitted in the opening direction and that it corresponds to the
maximum travel distance "
P
" of the gate. The travel limit must guarantee
anti-derailment and gate stability.
Attention!
Only for EU customers -
WEEE marking
.
This symbol indicates that once the products life-span has expired
it must be disposed of separately from other rubbish. The user is
therefore obliged to either take the product to a suitable differential
collection site for electronic and electrical goods or to send it back to
the manufacturer if the intention is to replace it with a new equivalent
version of the same product.
Suitable differential collection, environmental friendly treatment and disposal
contributes to avoiding negative effects on the ambient and consequently health
as well as favouring the recycling of materials.
Illicitly disposing of this product by the owner is punishable by law and will be dealt
with according to the laws and standards of the individual member nation.
During the opening/closing manoeuvre check for correct operation and activate the
emergency stop button in case of danger.
During blackouts the gate can be released and manually manoeuvred using the
supplied release key (see manual release fig.9).
Periodically check the moving parts for wear and tear and grease if required, using
lubricants which maintain their friction levels unaltered throughout time and are
suitable for temperatures of
-20 to +70 °C
.
In case of failure or operational anomalies switch off the power at the mains do not
attempt to repair the appliance yourself.
Eventual repair work must be carried out by specialised personnel using original
spare parts.
The appliance is suitable for continuous operation.
Note:
The newly installed system is guaranteed and respects the laws and stand-
ards in force. It is however the user's responsibility to maintain the efficiency of the
installation. You are advised to have the installation checked at least once a year
by qualified personnel.
USER
INSTRUCTIONS
s 4HEGEAREDMOTORCANBEPOSITIONEDEITHERTOTHELEFTORTOTHERIGHTOF
the passageway.
Important: read the paragraph "
INSTRUCTIONS FOR POSITIONING
THE UNIT
".
Anchoring the unit
(fig. 4, 5, 6)
Important!
Check the exact anchoring position with respect to the
alignment of the sliding gate.
s 2UNTHEPIPINGANDCONNECTIONWIRESTOTHEPOSITIONWHERETHEMOTOR
is to be installed.
s !TTACH THE ANCHOR BOLTS TO THE BASE PLATE
A
" allowing them to
protrude by
40 mm
and then tighten down using the supplied
M8
nuts.
s 0REPAREACEMENTPLINTHINTHEPOSITIONWHERETHEMOTORISTOBE
installed, with a depth of
350 mm
(the base should protrude by
about
25 mm
to avoid damage by pools of water building up under
the appliance).
s )NSERTTHEBASEPLATEMAKINGSURETHAT
- the electrical cables pass through the hole "
B
";
- the anchor bolts "
C
" are immersed into the cement base and the
base plate is perfectly level;
- the four protruding
50 mm
threaded bolts are perpendicular
to the base plate;
- the surface area of the base plate is clean
and free of cement residue.
s 4OINSTALLTHEGEAREDMOTORPROCEEDASFOLLOWS
- Unscrew the four
M8
nuts on the four threaded bolts (previously used
to block the anchor bolts) to about
15 mm
from the base of the anchor
plate.
Then insert the four washers and allow them to
rest on the nuts.
- Position the geared motor over the
four threaded bolts and allow it to
rest on the four washers.
- Fasten it to the base using the other
four washers and adjustment nuts
supplied with the kit, making sure
that the unit remains perfectly level
and stable. This will allow you to
adjust the height and position of
the motor later
on.
INSTALLATION
INSTRUCTIONS
PRELIMINARY CHECKS (fig.1, pag.2)
50
145
65
40
15
5
Содержание 101/SL402409
Страница 49: ...49 NOTES...