
CAPINTEC, INC.
CAPTUS
®
600
GENERAL OPERATIONAL SETUP
There are several things that
must
be done before using the CAPTUS
®
600 Thyroid Uptake
System for the first time. The following briefly describes these steps and refers the reader to
the appropriate section in the owner's manual in order to perform them.
•
Verify or set the date/time. Although the date and time are set in the factory, you
should verify that the date and time are correct. Reference CHAPTER 5: SYSTEM
INITIALIZATION, SECTION: DATE & TIME SETUP.
•
Set the heading name. The heading will appear at the top of all printouts. It is
recommended that the hospital name, clinic etc. be used for this option. Reference
CHAPTER 5: SYSTEM INITIALIZATION, SECTION: SETTING HOSPITAL OR
FACILITY NAME.
•
Select proper units; Ci or Bq. Although the system can be changed at any time, it is
recommended that the user set the proper units prior to using the unit to prevent
confusion. Reference CHAPTER 5: SYSTEM INITIALIZATION, SECTION:
CURIES/BEQUEREL SETUP.
•
Calibration Standard Source Setup: The conversion factor for the standard source
(Cesium-137) used to calibrate the CAPTUS
®
600 should also be entered or
measured. The CAPTUS
®
600 uses a Cs137 source to calibrate daily. Data about this
source should be entered into the CAPTUS
®
600. Reference. CHAPTER 5: SYSTEM
INITIALIZATION, SECTION: Cs137 STANDARD SETUP.
•
Chi-Square Setup: Before performing this test, the number of repetitions and
counting time intervals must be input. Reference CHAPTER 5: SYSTEM
INITIALIZATION, SECTION: CHI-SQUARE TEST SETUP.
•
Conversion Factors Setup: In order for the CAPTUS
®
600 to calculate the activity of
a radionuclide, the Conversion Factor for the radionuclide must be stored in the
CAPTUS
®
600 system. The Conversion Factor for the standard source (Cs137) used
to calibrate the CAPTUS
®
600 should also be entered or measured. Reference
CHAPTER 5: SYSTEM INITIALIZATION, SECTION: CONVERSION FACTORS.
ACCEPTANCE TESTING
The following tests
must
be performed prior to operational use of the unit.
•
Diagnostics Test:
Reference CHAPTER 6: ACCEPTANCE & QUALITY
ASSURANCE TESTS, SECTION: DIAGNOSTICS for instructions on how to perform
this test.
•
Calibration Test:
Reference CHAPTER 6: ACCEPTANCE & QUALITY
ASSURANCE TESTS, SECTION: CALIBRATION TEST for instructions on how to
perform this test.
November 07
SYSTEM SETUP
4-3
Содержание CAPTUS 600
Страница 2: ......
Страница 40: ......
Страница 62: ......
Страница 77: ...CAPINTEC INC CAPTUS 600 Page 1 November 07 ACCEPTANCE QUALITY ASSURANCE TESTS 6 15...
Страница 78: ...CAPINTEC INC CAPTUS 600 Page 2 Page 3 6 16 ACCEPTANCE QUALITY ASSURANCE TESTS November 07...
Страница 90: ......
Страница 102: ......
Страница 112: ...CAPINTEC INC CAPTUS 600 Figure 9 15 9 10 THYROID UPTAKE ONE CAPSULE METHOD November 07...
Страница 120: ...CAPINTEC INC CAPTUS 600 Figure 10 11 10 8 THYROID UPTAKE TWO CAPSULES METHOD November 07...
Страница 131: ...CAPINTEC INC CAPTUS 600 Figure 11 16 November 07 THYROID UPTAKE STANDARD CAPSULE METHOD 11 11...
Страница 132: ......
Страница 150: ...CAPINTEC INC CAPTUS 600 Figure 13 11 13 8 WIPE TEST November 07...
Страница 152: ......
Страница 162: ...CAPINTEC INC CAPTUS 600 Figure 15 5 15 4 LAB TESTS URINE TEST November 07...
Страница 167: ...CAPINTEC INC CAPTUS 600 Figure 16 5 November 07 LAB TESTS BLOOD TESTS 16 5...
Страница 171: ...CAPINTEC INC CAPTUS 600 Figure 16 9 November 07 LAB TESTS BLOOD TESTS 16 9...
Страница 175: ...CAPINTEC INC CAPTUS 600 Figure 16 14 November 07 LAB TESTS BLOOD TESTS 16 13...
Страница 176: ......
Страница 186: ......
Страница 208: ......
Страница 214: ......
Страница 216: ......
Страница 217: ......
Страница 218: ......