2. Installation
36
2-5) The “DENSITY ADJUSTMENT CONTROL” screen appears. Confirm that the
sensor is set with a sensor switch button. Press the [Fixed ROI Area] key.
2-6) Press the [Area setting] key.
2-7) The fixed ROI 1 setting screen appears. Input values A to D from step 3) into the
edit box, and press [ENABLE]. To set multiple fixed ROIs, input A’ to D’ and A”
to D” into fixed ROI 2 settings and fixed ROI 3 settings respectively.
Area setting button
A-A”
B-B”
C-C”
D-D”
Содержание CXDI-60G
Страница 23: ...2 Installation 7 2 CXDI System II assembly package Accessories box Power box ...
Страница 43: ...2 Installation 27 During normal imaging During timeout due to RX_REQ not negating Timeout 1100msec ...
Страница 115: ...2 Installation Manual 99 2 Power Box Mass 3 7 Kg Unit mm Dimension tolerance 1 Scale 1 N ...
Страница 116: ...2 Installation Manual 100 3 Remote Switch Mass 0 9 Kg inc cable Unit mm Dimension tolerance 1 Scale 1 N ...
Страница 120: ...3 Function 1 1 Imaging Unit 1 1 Block Diagram Imaging Unit Power Box Mainly signal systems Power supply system ...
Страница 154: ...CXDI SYSTEM Rev 01 CONTENTS IMAGING UNIT 1 POWER BOX 2 GRID UNID 3 SCHEMATIC DIAGRAM PWB 60 X RAY I F 4 ...
Страница 161: ...4a Canon Inc PWB 60 X RAY 1 2 SCHEMATIC DIAGRAM Rev 01 ...
Страница 162: ...4b Canon Inc PWB 60 X RAY 2 2 SCHEMATIC DIAGRAM Rev 01 ...