4. Repair Guide
5
Remove the two screws (M3x6) of the cable clamp plate, and disconnect the sensor cable.
4) Connect the connectors and replacement sensor cable in the sequence of steps 1) to 3).
After connecting the connectors, check that the IC soldered to the LED board are not
damaged.
5) Route the P2 connector wire bundle of the sensor cable inside the cable protection sheet.
Remove these two screws
Cable protection sheet
Содержание CXDI-60G
Страница 23: ...2 Installation 7 2 CXDI System II assembly package Accessories box Power box ...
Страница 43: ...2 Installation 27 During normal imaging During timeout due to RX_REQ not negating Timeout 1100msec ...
Страница 115: ...2 Installation Manual 99 2 Power Box Mass 3 7 Kg Unit mm Dimension tolerance 1 Scale 1 N ...
Страница 116: ...2 Installation Manual 100 3 Remote Switch Mass 0 9 Kg inc cable Unit mm Dimension tolerance 1 Scale 1 N ...
Страница 120: ...3 Function 1 1 Imaging Unit 1 1 Block Diagram Imaging Unit Power Box Mainly signal systems Power supply system ...
Страница 154: ...CXDI SYSTEM Rev 01 CONTENTS IMAGING UNIT 1 POWER BOX 2 GRID UNID 3 SCHEMATIC DIAGRAM PWB 60 X RAY I F 4 ...
Страница 161: ...4a Canon Inc PWB 60 X RAY 1 2 SCHEMATIC DIAGRAM Rev 01 ...
Страница 162: ...4b Canon Inc PWB 60 X RAY 2 2 SCHEMATIC DIAGRAM Rev 01 ...