ESC < > ENTER
a
3
ESC < > ENTER
i
SC <
SC
SC
<
<
> EN
EN
>
>
ESC < > ENTER
c l i
ESC < > ENTER
c l 2
ESC < > ENTER
o p 2
ESC < > ENTER
o p I
0
0
0
0
0
0
0
0
P.
25
- M
a
n
u
a
l co
d
e:
319
V21
EN
V
er
s.
3
0
9
/2
01
4 © C
A
M
E ca
n
ce
lli
a
u
to
m
a
ti
ci
S
.p.
A
. - T
h
e d
a
ta
a
n
d i
n
fo
rm
a
ti
o
n i
n
t
h
is m
a
n
u
a
l a
re su
b
je
ct to c
h
a
n
g
e a
t a
n
y t
im
e w
it
h
o
u
t
p
ri
o
r n
o
ti
ce re
q
u
ir
ed
by Ca
m
e Ca
n
ce
lli
A
u
to
m
a
ti
ci
S
.p.
A
.
ENGLISH
1) Select “A3”.
Press ENTER to confirm.
2) Select 1 and press ENTER to confirm,
the automatic gate run calibration
procedure...
Gate run calibration
3) the gate leaf of the first motor will close
fully until the mechanical stop…
4) …then, the gate leaf of the second
motor will do the same…
5) …then, the gate leaf of the second
motor, shall fully open until the mechanical
stop…
6) …then, the gate leaf of the first motor
will do the same.
N.B: before proceeding with the calibration of the gate run, check that the area of movement is free of any obstacles and check
that there is a mechanical stop or both opening and closing.
Important! While calibrating, all safety devices will be disabled until the end of the calibration excluding the “total stop”
Содержание zl92
Страница 29: ...ZL92 INSTALLATION MANUAL CONTROL PANEL FOR 24 V GEARMOTORS English EN 319V21EN ...
Страница 57: ...ZL92 MANUEL D INSTALLATION ARMOIRE DE COMMANDE POUR MOTOREDUCTEURS EN 24 V Français FR 319V21FR ...
Страница 85: ...ZL92 ИНСТРУКЦИЯ ПО УСТАНОВКЕ БЛОК УПРАВЛЕНИЯ ЭЛЕКТРОПРИВОДАМИ 24 В Русский RU 319V21RU ...