Configuring 60 GHz cnWave™
147
Configuring 60 GHz cnWave™
Nodes deployment
The configuration of cnWave nodes is handled automatically by the E2E service. However, the first PoP
node must be configured manually since connectivity to the E2E controller has not yet been established.
After establishing communication with the E2E controller, the nodes report a hash of their local
configuration file and the controller automatically pushes configuration changes to the nodes upon
seeing any mismatches. Centralized configuration management architecture implemented in which the
E2E controller, serves as the single point of truth for configurations in the network.
Figure 154:
Nodes deployment
More details on deployment of the 60 GHz series of products are available
Connecting to the unit
This section describes how to connect the unit to a management PC and power it up.
Configuring the management PC
Use this procedure to configure the local management PC to communicate with the 60 GHz cnWave
devices.
Содержание cnWave
Страница 1: ...USER GUIDE 60 GHz cnWave System Release 1 2 2 ...
Страница 56: ...System Hardware 56 Figure 37 10 GbE PoE C000000L141A ...
Страница 136: ...Installation 136 Figure 128 Connecting the power injector to ODU drop cable ...
Страница 205: ...Operation 205 SNR graph Figure 219 SNR graph MCS Index graph Figure 220 MCS Index graph ...