Configuring 60 GHz cnWave™
155
Enabling internal E2E Controller
E2E Controller handles important management functions such as link bring-up, software upgrades and
configuration management, etc. Enable E2E Controller to configure and establish the connection. To
enable E2E Controller, perform the following steps:
Note
The internal E2E controller is not required if you intend to tun the E2E controller On-Premise
(refer
E2E User Guide) .
Currently, the internal E2E controller is restricted to 31 nodes.
1. Click the E2E Controller option on the left pane of the Dashboard.
2. Click Enable E2E.
The Enable Onboard E2E dialog box appears.
Содержание cnWave
Страница 1: ...USER GUIDE 60 GHz cnWave System Release 1 2 2 ...
Страница 56: ...System Hardware 56 Figure 37 10 GbE PoE C000000L141A ...
Страница 136: ...Installation 136 Figure 128 Connecting the power injector to ODU drop cable ...
Страница 205: ...Operation 205 SNR graph Figure 219 SNR graph MCS Index graph Figure 220 MCS Index graph ...