Installation
99
V3000
Consider the following key points when installing V3000:
1. Use the recommended grounding and LPU connections.
2. Use the recommended cables for interfacing ODU (refer to the supported power supply and cable
length details in the
section).
3. Always install the ODU 0.5 meters below the tip of the pole.
shows a typical installation of V3000 CN on a mast and powered through outdoor AC/DC PSU.
Figure 69:
Typical installation - V3000 CN
Содержание cnWave
Страница 1: ...USER GUIDE 60 GHz cnWave System Release 1 2 2 ...
Страница 56: ...System Hardware 56 Figure 37 10 GbE PoE C000000L141A ...
Страница 136: ...Installation 136 Figure 128 Connecting the power injector to ODU drop cable ...
Страница 205: ...Operation 205 SNR graph Figure 219 SNR graph MCS Index graph Figure 220 MCS Index graph ...