Installation
144
Fitting the gland
1. Fit the gland body to the SFP port and tighten it to a torque of 5.5 Nm (4.3 lb-ft).
Figure 149:
Fitting the land body
2. Fit the gland nut and tighten until the rubber seal closes on the cable. Do not over-tighten the
gland nut, as there is a risk of damage to its internal components.
Содержание cnWave
Страница 1: ...USER GUIDE 60 GHz cnWave System Release 1 2 2 ...
Страница 56: ...System Hardware 56 Figure 37 10 GbE PoE C000000L141A ...
Страница 136: ...Installation 136 Figure 128 Connecting the power injector to ODU drop cable ...
Страница 205: ...Operation 205 SNR graph Figure 219 SNR graph MCS Index graph Figure 220 MCS Index graph ...