
3-16
Steps to Install the Rack-mount Model to the Tower Conversion Kit
Follow the procedure below to install the devices to the tower conversion kit.
1.
Open the front door of the tower conversion kit.
If the door is locked, use the server-accessory key
to unlock.
2.
Confirm the spots to fix 8 core nuts on the front
of the chassis.
See the figure on the right for where to fix
the core nuts
(4 on the front top and 4 on the front bottom.)
3.
Insert the bracket from the front of the conversion
kit. Tuck the bracket firmly to the back.
Tower conversion kit (on the front bottom)
Tower conversion kit (on the front top)
Содержание NovaScale R630 E1
Страница 1: ...NovaScale R630 E1 Setup Guide NOVASCALE REFERENCE 86 A1 43FA 00...
Страница 2: ......
Страница 14: ...xiv This page is intentionally left blank...
Страница 24: ...1 10 This page is intentionally left blank...
Страница 28: ...2 4 This page is intentionally left blank...
Страница 40: ...3 12 9 Fasten the levers on the left and right sides with screws 10 Mount the CPU IO module 1 in the same way...
Страница 50: ...3 22 This page is intentionally left blank...
Страница 104: ...4 54 6 Click the Advanced tab on the Performance Options window 7 Click Change in the Virtual memory box...
Страница 110: ...4 60 This page is intentionally left blank...
Страница 142: ...6 18 This page is intentionally left blank...
Страница 145: ......
Страница 146: ...BULL CEDOC 357 AVENUE PATTON B P 20845 49008 ANGERS CEDEX 01 FRANCE REFERENCE 86 A1 43FA 00...