Contents
Logano plus SB615 Gas - We reserve the right to make any changes due to technical modifications.
2
Contents
1
Explanation of symbols and safety instructions . . 3
1.1
Symbols . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3
1.2
Safety information . . . . . . . . . . . . . . . . . . . . . . . . . . 3
2
Information about the appliance . . . . . . . . . . . . . . . 5
2.1
EU Declaration of Conformity . . . . . . . . . . . . . . . . 5
2.2
Correct use . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5
2.3
Data plate . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5
2.4
Standard delivery . . . . . . . . . . . . . . . . . . . . . . . . . . 5
2.5
Tools, materials and auxiliary equipment . . . . . . . 5
2.6
Specifications, dimensions, connections . . . . . . . 6
3
Regulations, standards and guidelines . . . . . . . . . . 9
3.1
Low water indicator installation . . . . . . . . . . . . . . . 9
3.2
Standards and guidelines/directives . . . . . . . . . . . 9
3.3
Leaks . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 10
3.4
Safety limits . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 10
3.5
Boiler positioning . . . . . . . . . . . . . . . . . . . . . . . . . 11
3.5.1
Foundation and recommended wall clearances 11
3.5.2
Levelling the boiler . . . . . . . . . . . . . . . . . . . . . . . . 12
3.6
Disposal . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 12
4
Transporting the boiler . . . . . . . . . . . . . . . . . . . . . . . 13
4.1
Means of transport . . . . . . . . . . . . . . . . . . . . . . . . 13
4.1.1
Transporting the boiler using a forklift truck . . . . 13
4.1.2
Transporting the boiler using two pallet trucks . 13
5
Installation of the boiler . . . . . . . . . . . . . . . . . . . . . . 14
5.1
Checking delivery for completeness . . . . . . . . . . 14
5.2
Disposing of packaging . . . . . . . . . . . . . . . . . . . . 14
5.3
Minimum clearances / product dimensions . . . . 14
5.4
Changing the hinging of the burner door . . . . . . 14
5.5
Installing the minimum pressure switch and
minimum pressure limiter . . . . . . . . . . . . . . . . . . 15
5.6
Low water indicator (accesory), fitting
(400 – 600kW) . . . . . . . . . . . . . . . . . . . . . . . . . . 15
5.7
Connecting the boiler to the pipework . . . . . . . . 16
5.7.1
Connecting the return to the boiler . . . . . . . . . . . 16
5.7.2
Connecting the flow to the boiler . . . . . . . . . . . . 16
5.7.3
Connecting the safety line flow . . . . . . . . . . . . . . 16
5.8
Filling the heating system and checking
connections for leaks . . . . . . . . . . . . . . . . . . . . . 17
5.9
Fitting the lagging . . . . . . . . . . . . . . . . . . . . . . . . . 18
5.10
Fitting the connection plates . . . . . . . . . . . . . . . . 19
5.11
Fitting the side panels . . . . . . . . . . . . . . . . . . . . . 20
5.12
Routing the burner cable . . . . . . . . . . . . . . . . . . . 21
5.13
Fitting the back plate . . . . . . . . . . . . . . . . . . . . . . 22
5.14
Fitting the front boiler cover . . . . . . . . . . . . . . . . . 23
5.15
Fit and connect the control unit (accessory) . . . 23
5.16
Installing the temperature sensor set . . . . . . . . . 25
5.17
Fitting the boiler cover sections . . . . . . . . . . . . . 26
5.18
Fitting the front panel . . . . . . . . . . . . . . . . . . . . . . 27
5.19
Securing the shield, device label
and data plate . . . . . . . . . . . . . . . . . . . . . . . . . . . . 28
5.20
Connecting and filling the neutraliser
(accesory) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 28
5.21
Installing condensate pipework . . . . . . . . . . . . . 29
5.22
Connecting the flue side of the heating system 30
5.22.1 General information on flue systems . . . . . . . . . 30
5.22.2 Fitting the flue pipe sealing collar (accessory) . 30
5.22.3 Fitting the flue temperature sensor (accessory) 30
5.23
Fitting burner (accessory) and connecting gas
supply . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 31
5.23.1 Fitting the burner plate . . . . . . . . . . . . . . . . . . . . 31
5.23.2 Fitting the burner to the burner plate . . . . . . . . . 32
5.23.3 Connecting the gas supply . . . . . . . . . . . . . . . . . 33
6
Initial operation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 34
6.1
Flushing the heating system . . . . . . . . . . . . . . . . 34
6.2
Filling the heating system . . . . . . . . . . . . . . . . . . 35
6.3
Preparing the heating system for operation . . . 36
6.4
Commissioning the control unit and the burner 36
6.5
Commissioning report . . . . . . . . . . . . . . . . . . . . . 37
7
Shutdown . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 38
7.1
Shutting down the heating system . . . . . . . . . . 38
7.2
Shutting down the heating system in an
emergency . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 38
8
Inspection/maintenance . . . . . . . . . . . . . . . . . . . . . . 39
8.1
General notes . . . . . . . . . . . . . . . . . . . . . . . . . . . 39
8.2
Preparing the boiler for inspection and
maintenance . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 39
8.3
Cleaning the boiler . . . . . . . . . . . . . . . . . . . . . . . 40
8.4
Cleaning the flue gas collector . . . . . . . . . . . . . 42
8.5
Checking the heating system water pressure . . 43
8.6
Inspection and maintenance reports . . . . . . . . . 44