5
Installation of the boiler
Logano plus SB615 Gas - We reserve the right to make any changes due to technical modifications.
30
5.22
Connecting the flue side of the
heating system
This chapter explains how to install the boiler to the flue.
5.22.1 General information on flue systems
B
The flue gases in question must be led outside into the
open air via flue pipes and flues.
B
Use flue pipes and flues that conform to building
regulations and are resistant to humidity.
B
Before commissioning the heating system, check that
the flue gas system used is suitable for the boiler.
B
Follow guidelines in the planning instruction.
B
Check the flue connection for leaks.
B
Observe the flue system manufacturer’s installation
instructions.
5.22.2 Fitting the flue pipe sealing collar
(accessory)
B
Fit the flue pipe sealing collar as described in the
separate installation manual.
5.22.3 Fitting the flue temperature sensor
(accessory)
B
Fit the flue gas temperature sensor as described in the
separate installation manual.