6
Initial operation
Logano plus SB615 Gas - We reserve the right to make any changes due to technical modifications.
37
6.5
Commissioning report
B
Sign all commissioning work as completed and enter
the date.
Commissioning tasks
Page (individual steps)
Comments
(signature)
1.
Fill the heating system with water.
page 35
2.
Vent the heating system.
page 36
3.
Carry out leak testing (gas, flue gas, water).
page 33, page 30, page 17
4.
Start up the control unit.
Æ
control unit documenta-
tion
5.
Start-up the burner.
Æ
burner documentation
6.
Perform a leak test on the hot gas side. After being in
operation for a short time, retighten the burner door bolts
to prevent leaks around the door as a result of the pack-
ing cord settling.
7.
Inform the system user, hand over the technical docu-
mentation, and enter the fuel used in this heating system
in the table of the operating instructions.
8.
Confirm correct commissioning.
Company stamp/signature/date