5
Installation of the boiler
Logano plus SB615 Gas - We reserve the right to make any changes due to technical modifications.
29
5.21 Installing condensate pipework
B
Fit the siphon provided to the outlet on the flue gas
collector [5].
B
Unscrew the locking cap and fill the siphon with about
two litres of water.
Fig. 27 Installing condensate pipework
1
Connection elbow
2
Locking cap
3
Siphon
4
Siphon outlet to neutralisation device or waste water pipe
5
Flue gas collector
When installing the condensate pipework,
observe the following:
B
Carefully drain the condensate created
inside the boiler and possibly in the flue
pipe.
B
Drain the condensate into the sewerage
system in accordance with the
requirements in your country.
B
Observe regional requirements.
DANGER:
Risk to life from poisoning!
Siphons which are not filled with water, or
open connections, can cause a risk to life
from escaping flue gas.
B
Fill the siphon with water.
B
Ensure that the siphon and flue gas
connections are sealed.
B
Ensure that the sealing disc with gasket is
seated in the locking cap.
Neutralisation devices are available as
accessories.
B
Install neutralisation device (accessory) as
detailed in the installation instructions.