Boiler inspection and maintenance
16
53
We reserve the right to make any changes due to technical modifications.
Installation and maintenance instructions Gas Boiler Logano GC124 II/SP • Issue 07/2006
16.7 Maintenance protocol
Please check off the maintenance work as it is completed and record the measured values.
Follow the instructions on the following pages.
Maintenance work
Page
Date:
Date:
1.
Inspection of the flue system including combustion
air, inlet and outlet openings
page 43
2.
Inspection of boiler
Gas manifold pressure
page 43
page 21
3.
Inspection of burner
page 43
4.
Cleaning of boiler
page 45
5.
Cleaning of burner
page 51
6.
Measuring gas supply pressure GC124 II or
GC124 SP
page 30 or page 35
–––––––
inches W. C.
–––––––
inches W. C.
7
Measuring orifice pressure GC124 II or
GC124 SP
page 30 or page 35
–––––––
inches W. C.
–––––––
inches W. C.
8.
Checking for leaks in operating condition
page 26
9.
Checking pilot burner flame GC124 II or
GC124 SP
page 45 ff.or
page 46 ff.
10.
Checking main burner flame GC124 II
or GC 124 SP
page 30 or page 35
11.
Check the vent damper GC124 II
or GC124 SP
page 33 or page 39
12.
Check maximum aquastat GC124 II
or GC124 SP
page 34 or page 39
13.
Check the area around the boiler for flammable
materials, gasoline or corrosive liquids.
page 52
14.
Confirm maintenance
Confirmation of correct maintenance
(company stamp, signature)